DIMENSION DETERMINATION AND STRESS ANALYSIS OF PIPING SYSTEM IN WELL PAD 29 DIENG UNIT I GEOTHERMAL PRODUCTION FACILITY

Geothermal is one of alternative energy that very potensial in Indonesia. Up to 40% of geothermal energy in this world is located in Indonesia. 27357,5 Mwe geothermal energy that can be produced in Indonesia, but the fact that Indonesia just only used 1052 Mwe until 2008. Geothermal energy productio...

Full description

Saved in:
Bibliographic Details
Main Author: BHAKTI ARIFMAN , ANDY
Format: Final Project
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/14902
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:14902
spelling id-itb.:149022017-09-27T10:41:00ZDIMENSION DETERMINATION AND STRESS ANALYSIS OF PIPING SYSTEM IN WELL PAD 29 DIENG UNIT I GEOTHERMAL PRODUCTION FACILITY BHAKTI ARIFMAN , ANDY Teknik (Rekayasa, enjinering dan kegiatan berkaitan) Indonesia Final Project INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/14902 Geothermal is one of alternative energy that very potensial in Indonesia. Up to 40% of geothermal energy in this world is located in Indonesia. 27357,5 Mwe geothermal energy that can be produced in Indonesia, but the fact that Indonesia just only used 1052 Mwe until 2008. Geothermal energy production can be maximized by built some geothermal facilities. This facilities have also being supported by piping system design that safe from failure. <br /> <br /> <br /> This final project do some analysis of pipeline construction on the well pad 29 Dieng Unit I.This analysis covers hydraulic analysis with HYSYS program, the selection of the pipe diameter, pipe thickness selection based on ASME B31.1 Power Piping, insulation selection, and the stress analysis of piping systems. Stress analysis of piping design based on ASME B31.1 Power Piping and the model is build with AUTOPIPE program. Hydraulic analysis is used to determine the optimum pipe diameter for reaching the minimum criteria on tie in well pad 7 (12 bar and above 178 oC). Selected material for pipe is ASTM A53 Grade B. This selection is based on results of corrosion analysis on the pipe 2-phase, brine, and wet steam at 20 mpy, while for dry steam pipe at 5 mpy. Modeling of piping systems have been modified to have a high stress resistances. Studies show that the system will fail if the well head moves up about or move down above 0.3 m; the operating pressure is increase up to 30 bar; attacked by the earthquake up to 0.55 times the acceleration of earth gravity and because of the wind velocity above 250 km/hour. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
topic Teknik (Rekayasa, enjinering dan kegiatan berkaitan)
spellingShingle Teknik (Rekayasa, enjinering dan kegiatan berkaitan)
BHAKTI ARIFMAN , ANDY
DIMENSION DETERMINATION AND STRESS ANALYSIS OF PIPING SYSTEM IN WELL PAD 29 DIENG UNIT I GEOTHERMAL PRODUCTION FACILITY
description Geothermal is one of alternative energy that very potensial in Indonesia. Up to 40% of geothermal energy in this world is located in Indonesia. 27357,5 Mwe geothermal energy that can be produced in Indonesia, but the fact that Indonesia just only used 1052 Mwe until 2008. Geothermal energy production can be maximized by built some geothermal facilities. This facilities have also being supported by piping system design that safe from failure. <br /> <br /> <br /> This final project do some analysis of pipeline construction on the well pad 29 Dieng Unit I.This analysis covers hydraulic analysis with HYSYS program, the selection of the pipe diameter, pipe thickness selection based on ASME B31.1 Power Piping, insulation selection, and the stress analysis of piping systems. Stress analysis of piping design based on ASME B31.1 Power Piping and the model is build with AUTOPIPE program. Hydraulic analysis is used to determine the optimum pipe diameter for reaching the minimum criteria on tie in well pad 7 (12 bar and above 178 oC). Selected material for pipe is ASTM A53 Grade B. This selection is based on results of corrosion analysis on the pipe 2-phase, brine, and wet steam at 20 mpy, while for dry steam pipe at 5 mpy. Modeling of piping systems have been modified to have a high stress resistances. Studies show that the system will fail if the well head moves up about or move down above 0.3 m; the operating pressure is increase up to 30 bar; attacked by the earthquake up to 0.55 times the acceleration of earth gravity and because of the wind velocity above 250 km/hour.
format Final Project
author BHAKTI ARIFMAN , ANDY
author_facet BHAKTI ARIFMAN , ANDY
author_sort BHAKTI ARIFMAN , ANDY
title DIMENSION DETERMINATION AND STRESS ANALYSIS OF PIPING SYSTEM IN WELL PAD 29 DIENG UNIT I GEOTHERMAL PRODUCTION FACILITY
title_short DIMENSION DETERMINATION AND STRESS ANALYSIS OF PIPING SYSTEM IN WELL PAD 29 DIENG UNIT I GEOTHERMAL PRODUCTION FACILITY
title_full DIMENSION DETERMINATION AND STRESS ANALYSIS OF PIPING SYSTEM IN WELL PAD 29 DIENG UNIT I GEOTHERMAL PRODUCTION FACILITY
title_fullStr DIMENSION DETERMINATION AND STRESS ANALYSIS OF PIPING SYSTEM IN WELL PAD 29 DIENG UNIT I GEOTHERMAL PRODUCTION FACILITY
title_full_unstemmed DIMENSION DETERMINATION AND STRESS ANALYSIS OF PIPING SYSTEM IN WELL PAD 29 DIENG UNIT I GEOTHERMAL PRODUCTION FACILITY
title_sort dimension determination and stress analysis of piping system in well pad 29 dieng unit i geothermal production facility
url https://digilib.itb.ac.id/gdl/view/14902
_version_ 1820737341537386496