Design of Steam Production Facility Piping System at the Geothermal Power Plant System Case Study: Dieng Geothermal Power Plant

Human needs for primary energy and electricity in Indonesia is increasing, while the source of the fuel used from fossil fuels reduced in number. Geothermal become one of alternative energy solutions that can be utilized for power plant generation. This final project conduct the design of steam...

Full description

Saved in:
Bibliographic Details
Main Author: Setiadi, Farid
Format: Final Project
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/39268
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia