Design of Steam Production Facility Piping System at the Geothermal Power Plant System Case Study: Dieng Geothermal Power Plant
Human needs for primary energy and electricity in Indonesia is increasing, while the source of the fuel used from fossil fuels reduced in number. Geothermal become one of alternative energy solutions that can be utilized for power plant generation. This final project conduct the design of steam...
Saved in:
主要作者: | |
---|---|
格式: | Final Project |
語言: | Indonesia |
主題: | |
在線閱讀: | https://digilib.itb.ac.id/gdl/view/39268 |
標簽: |
添加標簽
沒有標簽, 成為第一個標記此記錄!
|
機構: | Institut Teknologi Bandung |
語言: | Indonesia |
成為第一個發表評論!