Design of Steam Production Facility Piping System at the Geothermal Power Plant System Case Study: Dieng Geothermal Power Plant
Human needs for primary energy and electricity in Indonesia is increasing, while the source of the fuel used from fossil fuels reduced in number. Geothermal become one of alternative energy solutions that can be utilized for power plant generation. This final project conduct the design of steam...
Saved in:
Main Author: | Setiadi, Farid |
---|---|
Format: | Final Project |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/39268 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
STUDY OF GEOTHERMAL STEAM PURITY IN GEOTHERMAL POWER PLANT
by: Wilantara, Bayu -
BRINE PIPING SYSTEM DESIGN IN GEOTHERMAL POWER PLANT FACILITIES CIBUNI 10 MW NETT.
by: Victor Setiyohadi, Eunico -
IMPROVEMENT OF STEAM PURITY GEOTHERMAL POWER PLANT WITH AIR COOLED HEAT EXCHANGER
by: Akbar Kharisma, Rafi -
DIMENSION DETERMINATION AND STRESS ANALYSIS OF PIPING SYSTEM IN WELL PAD 29 DIENG UNIT I GEOTHERMAL PRODUCTION FACILITY
by: BHAKTI ARIFMAN , ANDY -
MAPPING OF THE LUMUT BALAI GEOTHERMAL POWER PLANT (GPP)
by: Mabruroh, Silvia