Design of Steam Production Facility Piping System at the Geothermal Power Plant System Case Study: Dieng Geothermal Power Plant

Human needs for primary energy and electricity in Indonesia is increasing, while the source of the fuel used from fossil fuels reduced in number. Geothermal become one of alternative energy solutions that can be utilized for power plant generation. This final project conduct the design of steam...

Full description

Saved in:
Bibliographic Details
Main Author: Setiadi, Farid
Format: Final Project
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/39268
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:39268
spelling id-itb.:392682019-06-25T10:28:42ZDesign of Steam Production Facility Piping System at the Geothermal Power Plant System Case Study: Dieng Geothermal Power Plant Setiadi, Farid Teknik (Rekayasa, enjinering dan kegiatan berkaitan) Indonesia Final Project INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/39268 Human needs for primary energy and electricity in Indonesia is increasing, while the source of the fuel used from fossil fuels reduced in number. Geothermal become one of alternative energy solutions that can be utilized for power plant generation. This final project conduct the design of steam production facility piping system at the geothermal power plant system Dieng PAD 29 and PAD 30. The design include hidraulic analysis, selection of pipe diameter, pipe material, and pipe thickness based on code ASME B31.1 power piping, and the last is stress analysys and integrity modelling of piping system. The results obtained from the hydraulic analysis in accordance with the criteria at PAD 29 to the tie-in PAD 7 at 12,91 bar, 191,3 ° C, 10,74 MW, and for PAD 30 to tie-in PAD 28 at 10,8 bar, 183,3 ° C, 24,3 MW. For the selection of pipe material selected ASTM A53 Grade B with the results of the prediction of corrosion on the pipe 2-phase, brine, and wet steam at 20 mpy, while to dry steam at 5 mpy. Integrity of the modified power piping systems are safe from various types of loads. The boundaries of the integrity on PAD 29 shows the system will fail if the well head moved up and down as far as 0,7 m or 0,4 m, the operating pressure up to 29 bar, hit by an earthquake up to 0,7 times from the acceleration of gravity, or when experiencing a wind load of 140 km / h. While the boundaries of the integrity on PAD 30 shows the system will fail if the well head moved up and down as far as 0,6 m or 0,3 m, the operating pressure up to 22 bar, hit by an earthquake up to 0,7 times from the acceleration of gravity, or when experiencing a wind load of 100 km / h. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
topic Teknik (Rekayasa, enjinering dan kegiatan berkaitan)
spellingShingle Teknik (Rekayasa, enjinering dan kegiatan berkaitan)
Setiadi, Farid
Design of Steam Production Facility Piping System at the Geothermal Power Plant System Case Study: Dieng Geothermal Power Plant
description Human needs for primary energy and electricity in Indonesia is increasing, while the source of the fuel used from fossil fuels reduced in number. Geothermal become one of alternative energy solutions that can be utilized for power plant generation. This final project conduct the design of steam production facility piping system at the geothermal power plant system Dieng PAD 29 and PAD 30. The design include hidraulic analysis, selection of pipe diameter, pipe material, and pipe thickness based on code ASME B31.1 power piping, and the last is stress analysys and integrity modelling of piping system. The results obtained from the hydraulic analysis in accordance with the criteria at PAD 29 to the tie-in PAD 7 at 12,91 bar, 191,3 ° C, 10,74 MW, and for PAD 30 to tie-in PAD 28 at 10,8 bar, 183,3 ° C, 24,3 MW. For the selection of pipe material selected ASTM A53 Grade B with the results of the prediction of corrosion on the pipe 2-phase, brine, and wet steam at 20 mpy, while to dry steam at 5 mpy. Integrity of the modified power piping systems are safe from various types of loads. The boundaries of the integrity on PAD 29 shows the system will fail if the well head moved up and down as far as 0,7 m or 0,4 m, the operating pressure up to 29 bar, hit by an earthquake up to 0,7 times from the acceleration of gravity, or when experiencing a wind load of 140 km / h. While the boundaries of the integrity on PAD 30 shows the system will fail if the well head moved up and down as far as 0,6 m or 0,3 m, the operating pressure up to 22 bar, hit by an earthquake up to 0,7 times from the acceleration of gravity, or when experiencing a wind load of 100 km / h.
format Final Project
author Setiadi, Farid
author_facet Setiadi, Farid
author_sort Setiadi, Farid
title Design of Steam Production Facility Piping System at the Geothermal Power Plant System Case Study: Dieng Geothermal Power Plant
title_short Design of Steam Production Facility Piping System at the Geothermal Power Plant System Case Study: Dieng Geothermal Power Plant
title_full Design of Steam Production Facility Piping System at the Geothermal Power Plant System Case Study: Dieng Geothermal Power Plant
title_fullStr Design of Steam Production Facility Piping System at the Geothermal Power Plant System Case Study: Dieng Geothermal Power Plant
title_full_unstemmed Design of Steam Production Facility Piping System at the Geothermal Power Plant System Case Study: Dieng Geothermal Power Plant
title_sort design of steam production facility piping system at the geothermal power plant system case study: dieng geothermal power plant
url https://digilib.itb.ac.id/gdl/view/39268
_version_ 1822925242641678336