#TITLE_ALTERNATIVE#
Horizontal well is a type of well which is able to produce either oil or gas with high productivity level. In constructing horizontal well, determining the direction and the length of the well is crucial. This is due to the use of reservoir simulator that too often makes the ineffective work. This i...
Saved in:
Main Author: | PUTRA (NIM : 10108080); Pembimbing 1 : Prof. Dr. Edy Soewono; Pembimbing 2 : Ir. Tutuka Ari, ARAGANI |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/14966 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
#TITLE_ALTERNATIVE#
by: PUTRA WIJAYA (NIM 10107093); Pembimbing : Prof. Dr. Edy Soewono, KARUNIA -
#TITLE_ALTERNATIVE#
by: INDAH (NIM 10107083); Pembimbing : Prof. Dr. Edy Soewono, NADIA -
#TITLE_ALTERNATIVE#
by: CHOUVANI (NIM 10107021); Pembimbing : Prof. Dr. Edy Soewono, JESSICA -
#TITLE_ALTERNATIVE#
by: ILAHI (NIM : 20112021) ; Pembimbing Prof.Dr.Edy Soewono, FADILAH -
#TITLE_ALTERNATIVE#
by: TIMOTIUS SIMANGUNSONG (NIM : 13605055); Pembimbing 1 : Dr. Ir. Edy Suwondo; Pembimbing 2 : Ro, JUMADI