STUDIES OF COOLING WATER DISTRIBUTION INSIDE CONDENSER IN PLTP WAYANG WINDU UNIT 2 THROUGH CFD MODELLING
Energy crisis is one of the main problem for all countries around the word, this problem was encouraged by significant industrial growth especially in Indonesia. One of the potential altenative energy to face energy crisis is developing Geothermal Power Plant. <br /> <br /> <br />...
Saved in:
Main Author: | PRASETYO UTOMO (NIM : 13107135); Pembimbing : Dr. Willy Adriansyah ST, MT, ARI |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/15022 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
ANALISIS UNJUK KERJA PEMBANGKIT LISTRIK TENAGA PANAS BUMI (PLTP) WAYANG WINDU PENGALENGAN JAWA BARAT TAHUN 2009
by: , Agus Supriyono, et al.
Published: (2011) -
PERANCANGAN SISTEM PENDINGINAN BRINE PADA PEMBANGKIT LISTRIK TENAGA PANAS BUMI (PLTP)
(STUDI KASUS : UNIT PRODUKSI PAD#29 PLTP PT. GEO DIPA ENERGI DIENG)
by: , PUNDY SAPUTRO, et al.
Published: (2013) -
THERMODYNAMICS ANALYSIS OF DOUBLE FLASH CYCLE AT THE WAYANG WINDU UNIT 1 GEOTHERMAL POWER PLANT
by: WIRAWAN (NIM : 131 06 042); Dosen Pembimbing : Prof. Dr. Ir. T.A. Fauzi Soelaiman, MSME , IRWAN -
PLTP: Pembangkit Ramah Lingkungan
by: Perpustakaan UGM, i-lib
Published: (1999) -
Recovery silika amorf dari lumpur panas bumi PLTP Dieng
by: , PURWATMOKO, R. Heri, et al.
Published: (2009)