STUDI ESTIMASI ONGKOS PENGGUNAAN KAPASITAS SALURAN TRANSMISI PADA WHEELING DENGAN METODA BASIS ARUS
The methods developed in recent years for calculating cost allocation of transmission line capacity use by wheeling transaction is based on power flow. The weakness of the method lies on the property of power, that is not linear so that there is difficulty in allocating cost to each wheeler. The way...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/1534 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Summary: | The methods developed in recent years for calculating cost allocation of transmission line capacity use by wheeling transaction is based on power flow. The weakness of the method lies on the property of power, that is not linear so that there is difficulty in allocating cost to each wheeler. The way out so far used is by linearization and fross simplifying assumptions that produces inaccurate results. This thesis reports a new method that overcomes the weakness by using current flow method. The method besides its higher accuracy and speed offers flexibility enable by superposition principle so that each wheeling transaction can be treated individually independent from any others ones. |
---|