STUDI ESTIMASI ONGKOS PENGGUNAAN KAPASITAS SALURAN TRANSMISI PADA WHEELING DENGAN METODA BASIS ARUS

The methods developed in recent years for calculating cost allocation of transmission line capacity use by wheeling transaction is based on power flow. The weakness of the method lies on the property of power, that is not linear so that there is difficulty in allocating cost to each wheeler. The way...

Full description

Saved in:
Bibliographic Details
Main Author: SULISTYONO
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/1534
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
Description
Summary:The methods developed in recent years for calculating cost allocation of transmission line capacity use by wheeling transaction is based on power flow. The weakness of the method lies on the property of power, that is not linear so that there is difficulty in allocating cost to each wheeler. The way out so far used is by linearization and fross simplifying assumptions that produces inaccurate results. This thesis reports a new method that overcomes the weakness by using current flow method. The method besides its higher accuracy and speed offers flexibility enable by superposition principle so that each wheeling transaction can be treated individually independent from any others ones.