STUDY ON CONSTRUCTION PROJECTS INDIRECT COST ESTIMATING PRACTICES BY ON LARGE CONTRACTORS IN JAKARTA AND BANDUNG
Indirect cost is part of the of construction project costs that cannot associated directly with the physical component of the end volume of the project, but have contributed to the completion of the project. Indirect cost estimation is not easy to do compared to estimating the direct costs, which c...
Saved in:
Main Author: | YUSUF (NIM : 250 08 014); Dosen Pembimbing, Ir. Biemo W. Soemardi, MSE., Ph.D., DIANA |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/15379 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
THE STUDY ON CONSTRUCTION PROJECTS INDIRECT COST COMPONENT COST ESTIMATING PRACTICES IN BY MEDIUM-SIZE CONTRACTORS IN BANDUNG AND JAKARTA
by: RAHADIAN (NIM : 25008011); Pembimbing ; Ir. Biemo W. Soemardi, MSE., Ph. D, DONY -
PROFILE SOFT COMPETENCIES OF FOREMAN CONSTRUCTION PROJECT AND PARTNER ASSESSMENT IN DKI JAKARTA AND CITY OF BANDUNG
by: BUDIMAN (NIM : 250.07.007); Pembimbing ; DR. IR. Biemo W. Soemardi; DR. Indryati Soenaryo, M, ARI -
MODEL DEVELOPMENT OF READINEES ASSESSMENT OF LOCAL CONTRACTORS IN ACTIVITY MRT JAKARTA TUNNELING PROJECT
by: PRIHATIN (NIM : 25 007 307); Dosen Pembimbing : Ir. Biemo W. Soemardi, Ph.D, YULIA -
Costs of construction accidents to Singapore contractors
by: Teo, E.A.-L., et al.
Published: (2014) -
Development of systematic partnering for Chinese contractors in international construction projects
by: Yibao, Wu
Published: (2013)