ROLES AND FUNCTION OF FOREMAN IN THE ORGANIZATION OF LABOR IN CONSTRUCTION PROJECT

In a construction project, workers are resources that are directly related to the implementation of the job, so workers have a big share in the completion of the project and at the same time as the determinant whether the project will meet the highest standards of quality as specified. Groups of wor...

Full description

Saved in:
Bibliographic Details
Main Author: ENDRI WAHYUDI (NIM : 25007006); Pembimbing ; DR. IR. Biemo W. Soemardi; DR. Indryati Soenaryo, M.Sc
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/15543
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia