THE STUDY ON CONSTRUCTION PROJECTS INDIRECT COST COMPONENT COST ESTIMATING PRACTICES IN BY MEDIUM-SIZE CONTRACTORS IN BANDUNG AND JAKARTA

Indirect cost is the most difficult cost components to estimate. While the direct cost can be estimated quite accurately by referring to the drawings and technical specifications, the determination of indirect costs is often carried out without clear reference. This study aims to obtain a picture of...

Full description

Saved in:
Bibliographic Details
Main Author: RAHADIAN (NIM : 25008011); Pembimbing ; Ir. Biemo W. Soemardi, MSE., Ph. D, DONY
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/15436
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:15436
spelling id-itb.:154362017-09-27T15:23:28ZTHE STUDY ON CONSTRUCTION PROJECTS INDIRECT COST COMPONENT COST ESTIMATING PRACTICES IN BY MEDIUM-SIZE CONTRACTORS IN BANDUNG AND JAKARTA RAHADIAN (NIM : 25008011); Pembimbing ; Ir. Biemo W. Soemardi, MSE., Ph. D, DONY Indonesia Theses INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/15436 Indirect cost is the most difficult cost components to estimate. While the direct cost can be estimated quite accurately by referring to the drawings and technical specifications, the determination of indirect costs is often carried out without clear reference. This study aims to obtain a picture of the pattern characteristics of indirect cost estimates performed by the medium contractors in Bandung and Jakarta. <br /> <br /> <br /> Data in this study is collected by means of survey, interviews and costs data collection to twenty medium contractors in the area of Bandung and Jakarta. The respondents are staffs and directors of contractor companies. Results of analysis showed that in practice contractors assigned indirect costs as a percentage of direct costs. In determining the amount of percentage, the contractor used record of the previous project cost data and estimates of the level of risk that the project will be done based on experience. This study also formulated a model to estimate indirect cost component of construction projects by means of regression of the construction budget data submitted by contractors during the bidding process. The model showed that the ratio between indirect cost to total cost tends to decrease with the increment of total project value. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description Indirect cost is the most difficult cost components to estimate. While the direct cost can be estimated quite accurately by referring to the drawings and technical specifications, the determination of indirect costs is often carried out without clear reference. This study aims to obtain a picture of the pattern characteristics of indirect cost estimates performed by the medium contractors in Bandung and Jakarta. <br /> <br /> <br /> Data in this study is collected by means of survey, interviews and costs data collection to twenty medium contractors in the area of Bandung and Jakarta. The respondents are staffs and directors of contractor companies. Results of analysis showed that in practice contractors assigned indirect costs as a percentage of direct costs. In determining the amount of percentage, the contractor used record of the previous project cost data and estimates of the level of risk that the project will be done based on experience. This study also formulated a model to estimate indirect cost component of construction projects by means of regression of the construction budget data submitted by contractors during the bidding process. The model showed that the ratio between indirect cost to total cost tends to decrease with the increment of total project value.
format Theses
author RAHADIAN (NIM : 25008011); Pembimbing ; Ir. Biemo W. Soemardi, MSE., Ph. D, DONY
spellingShingle RAHADIAN (NIM : 25008011); Pembimbing ; Ir. Biemo W. Soemardi, MSE., Ph. D, DONY
THE STUDY ON CONSTRUCTION PROJECTS INDIRECT COST COMPONENT COST ESTIMATING PRACTICES IN BY MEDIUM-SIZE CONTRACTORS IN BANDUNG AND JAKARTA
author_facet RAHADIAN (NIM : 25008011); Pembimbing ; Ir. Biemo W. Soemardi, MSE., Ph. D, DONY
author_sort RAHADIAN (NIM : 25008011); Pembimbing ; Ir. Biemo W. Soemardi, MSE., Ph. D, DONY
title THE STUDY ON CONSTRUCTION PROJECTS INDIRECT COST COMPONENT COST ESTIMATING PRACTICES IN BY MEDIUM-SIZE CONTRACTORS IN BANDUNG AND JAKARTA
title_short THE STUDY ON CONSTRUCTION PROJECTS INDIRECT COST COMPONENT COST ESTIMATING PRACTICES IN BY MEDIUM-SIZE CONTRACTORS IN BANDUNG AND JAKARTA
title_full THE STUDY ON CONSTRUCTION PROJECTS INDIRECT COST COMPONENT COST ESTIMATING PRACTICES IN BY MEDIUM-SIZE CONTRACTORS IN BANDUNG AND JAKARTA
title_fullStr THE STUDY ON CONSTRUCTION PROJECTS INDIRECT COST COMPONENT COST ESTIMATING PRACTICES IN BY MEDIUM-SIZE CONTRACTORS IN BANDUNG AND JAKARTA
title_full_unstemmed THE STUDY ON CONSTRUCTION PROJECTS INDIRECT COST COMPONENT COST ESTIMATING PRACTICES IN BY MEDIUM-SIZE CONTRACTORS IN BANDUNG AND JAKARTA
title_sort study on construction projects indirect cost component cost estimating practices in by medium-size contractors in bandung and jakarta
url https://digilib.itb.ac.id/gdl/view/15436
_version_ 1820737469207805952