THE STUDY ON CONSTRUCTION PROJECTS INDIRECT COST COMPONENT COST ESTIMATING PRACTICES IN BY MEDIUM-SIZE CONTRACTORS IN BANDUNG AND JAKARTA
Indirect cost is the most difficult cost components to estimate. While the direct cost can be estimated quite accurately by referring to the drawings and technical specifications, the determination of indirect costs is often carried out without clear reference. This study aims to obtain a picture of...
Saved in:
Main Author: | RAHADIAN (NIM : 25008011); Pembimbing ; Ir. Biemo W. Soemardi, MSE., Ph. D, DONY |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/15436 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
STUDY ON CONSTRUCTION PROJECTS INDIRECT COST ESTIMATING PRACTICES BY ON LARGE CONTRACTORS IN JAKARTA AND BANDUNG
by: YUSUF (NIM : 250 08 014); Dosen Pembimbing, Ir. Biemo W. Soemardi, MSE., Ph.D., DIANA -
THE STUDY OF EARNED VALUE MANAGEMENT SYSTEM (EVMS) DEVELOPMENT POTENTIAL FOR SMALL CONTRACTORS COST ACCOUNTING SYSTEM
by: PUJOARTANTO (NIM 25005017); Pembimbing: Ir. Biemo W. Soemardi, MSE., Ph.D., NURUDDIN -
IDENTIFICATION OF PERFORMANCE INDICATORS FOR SMALL AND MEDIUM-SIZED CONTRACTORS IN BANDUNG CITY
by: Fadila Rahmadani, Aisha -
Costs of construction accidents to Singapore contractors
by: Teo, E.A.-L., et al.
Published: (2014) -
ANALYSIS OF THE IMPLEMENTATION OF COST COMPONENTS OF CONSTRUCTION SAFETY MANAGEMENT SYSTEMS IN BUILDING CONSTRUCTION PROJECTS HANDLED BY SMALL-SCALE CONTRACTORS IN BANDUNG CITY
by: Dharmawan, Aditya