contruction method, diaphragm wall, bored pile foundation, ground anchor, engineerâs estimate project scheduling, unit pricing analysis, direct cost, indirect cost.
Green Motion is a high rise building that function as a mall and office. This structure will be available in the city of Medan, North Sumatra. This building is made to fulfill the need of workspace and place for entertainment. The planning process of Green Motion consists of construction method, imp...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/37107 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |