contruction method, diaphragm wall, bored pile foundation, ground anchor, engineerâs estimate project scheduling, unit pricing analysis, direct cost, indirect cost.
Green Motion is a high rise building that function as a mall and office. This structure will be available in the city of Medan, North Sumatra. This building is made to fulfill the need of workspace and place for entertainment. The planning process of Green Motion consists of construction method, imp...
Saved in:
Main Author: | Roberto |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/37107 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
DESIGN OF BORED PILE FOUNDATION AND DIAPHRAGM WALL WITH GROUND ANCHOR JABABEKA FILM INSTITUTE
by: TRI HOTMA SIRAIT , JANNETTA -
DIGITAL LIFESTYLE CENTER BSD BORED PILE FOUNDATION AND DIAPHRAGM WALL WITH GROUND ANCHOR DESIGN
by: PUTRI PAMBHARU (NIM: 15014072), ABHINAYA -
DESIGN OF BORED PILES AND DIAPHRAGM WALL WITH GROUND ANCHOR FOR KEDIRI STADIUM
by: Patar Matius Sitor, Christopher -
DESIGN OF BORED PILE FOUNDATION AND DIAPHRAGM WALL WITH GROUND ANCHOR SUPPORT IN INDONESIAN MUSEUM OF TRADITIONAL GAMES, CENTRAL JAKARTA
by: Qamilla, Nadia -
DESIGN OF BORED PILE FOUNDATIONS, DIAPHRAGM WALL WITH GROUND ANCHOR BANDUNG INTERNATIONAL BOARDING SCHOOL KOTA BARU PARAHYANGAN
by: Johansen Ridawaputra, Samuel