DEVELOPMENT OF MANAGING AND SCHEDULING MAINTENANCE ACTIVITIES SYSTEM
Every company wants their machine to work optimally, therefore, maintenance is an essential aspect. Maintenance operation become hard to manage when machine becomes more complex and varies. Maintenance system is needed to manage it. This final project tries to make a maintenance system using prevent...
Saved in:
Main Author: | TANUWIHARDJA (NIM : 13106071); Tim Pembimbing : Prof. Dr. Yatna Yuwana Martawirya; Dr. Sr, GINANJAR |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/15784 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
DEVELOPMENT OF MANAGING AND SCHEDULING MAINTENANCE ACTIVITIES SYSTEM
by: TANUWIHARDJA (NIM : 13106071); Pembimbing 1 : Prof. Dr. Yatna Yuwana Martawirya; Pembimbi, GINANJAR -
EQUIPMENT MANAGEMENT AS PART OF MANAGING AND SCHEDULING MAINTENANCE ACTIVITY SYSTEM
by: KELVIN BUDIMAN (NIM : 13106125); Pembimbing Utama : Prof. Dr. Yatna Yuwana Martawirya; Pembim, KWEE -
DEVELOPMENT OF INTEGRATED TOOLS MODEL FOR DEVELOPMENT OF MAINTENANCE SYSTEM (CASE STUDY INVENTORY CONTROL)
by: SULAIMAN (NIM : 13105067); Tim Pembimbing : Prof. Dr. Ir. Yatna Yuwana Martawirya; Dr. Sri Rah, TEGUH -
DEVELOPMENT OF INTEGRATED TOOLS MODEL FOR DEVELOPMENT OF MAINTENANCE SYSTEM (CASE STUDY INVENTORY CONTROL)
by: SULAIMAN (NIM : 13105067); Pembimbing Utama : Prof. Dr. Ir. Yatna Yuwana Martawirya; Pembimb, TEGUH -
PRODUCTION MACHINERY MAINTENANCE SYSTEM DEVELOPMENT BASED ON PREVENTIVE MAINTENANCE FOR MECHANICAL WORKSHOP DEPARTMENT OF MECHANICAL ENGINEERING POLYTECHNIC STATE OF UJUNG PANDANG
by: HALIK RAZAK (NIM : 231 08 006); Pembimbing Utama : Prof. Dr. Ir. Yatna Yuwana Martawirya; Pe, ARTHUR