#TITLE_ALTERNATIVE#
PT. X is a company dealing with gas turbine engine maintenance. Reject rate and TAT delay of PT. X are still below the worldclass company standards. Therefore it is necessary to improve the quality of maintenance process of PT. X. To improve the quality of maintenance process, it is not enough by on...
Saved in:
Main Author: | SETIAJAYA SULAIMAN (NIM : 136 07 601); Pembimbing: Dr. Ir. Edy Suwondo, HIRONIMUS |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/15951 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
#TITLE_ALTERNATIVE#
by: HENDARSO (NIM : 13604003); Pembimbing: Dr. Ir. Edy Suwondo, LUTHFI -
#TITLE_ALTERNATIVE#
by: FIKRI MUFLIHUN (NIM : 13607041); Pembimbing: Dr. Ir. Edy Suwondo, CAESAR -
#TITLE_ALTERNATIVE#
by: TIMOTIUS SIMANGUNSONG (NIM : 13605055); Pembimbing 1 : Dr. Ir. Edy Suwondo; Pembimbing 2 : Ro, JUMADI -
#TITLE_ALTERNATIVE#
by: RATNA WATI (NIM : 23607024); Pembimbing 1 : Dr. Ir. Edy Suwondo Pembimbing 2 : Dr. Ir. Hisar M, EVITA -
#TITLE_ALTERNATIVE#
by: IRSYADUL FAHMI YZ (NIM : 101 07 014); Pembimbing : Prof. Dr. Edy Tri Baskoro,