RISK ASSESSMENT FOR PRODUCTION SEPARATOR IN SEPARATION SYSTEM BASED ON DNV RP-G101 CASE STUDY: LIMA FLOW STATION
Risk Assessment is an activity to calculate the value of the risk from a system and equipment. The purpose of risk assessment is to reduce and minimize the negative impacts <br /> <br /> <br /> that threaten the safety aspects, financial losses, nor environmental damage suffered...
Saved in:
主要作者: | |
---|---|
格式: | Final Project |
語言: | Indonesia |
在線閱讀: | https://digilib.itb.ac.id/gdl/view/16035 |
標簽: |
添加標簽
沒有標簽, 成為第一個標記此記錄!
|