EQUIPMENT MANAGEMENT AS PART OF MANAGING AND SCHEDULING MAINTENANCE ACTIVITY SYSTEM
Every company wants its machine to work in optimum state, where its lifetime can reach it’s lifetime design. For that purpose, maintenance is an essential aspect. Maintenance activity become hard to be managed when machine become complex and varies. Maintenance system is needed to manage them. In...
Saved in:
Main Author: | KELVIN BUDIMAN (NIM : 13106125); Pembimbing Utama : Prof. Dr. Yatna Yuwana Martawirya; Pembim, KWEE |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/16261 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
DEVELOPMENT OF MANAGING AND SCHEDULING MAINTENANCE ACTIVITIES SYSTEM
by: TANUWIHARDJA (NIM : 13106071); Pembimbing 1 : Prof. Dr. Yatna Yuwana Martawirya; Pembimbi, GINANJAR -
DEVELOPMENT OF MANAGING AND SCHEDULING MAINTENANCE ACTIVITIES SYSTEM
by: TANUWIHARDJA (NIM : 13106071); Tim Pembimbing : Prof. Dr. Yatna Yuwana Martawirya; Dr. Sr, GINANJAR -
PRELIMINARY STUDY MANAGEMENT OF POST CONSUMPTION PRODUCTS FROM ELECTRICAL ELECTRONICS EQUIPMENT IN INDONESIA
by: SUBEKTI (NIM: 231 04 025); Pembimbing : Dr. Ir. Yatna Yuwana Martawirya, RUMINTO -
SCHEDULE DECISION MAKING METHOD FOR AUTONOMOUS DISTRIBUTION MANUFACTURING SYSTEM
by: BERNADI (NIM : 13105010); Pembimbing Utama : Prof. Dr. Ir. Yatna Yuwana Martawirya, LUCKY -
THE DEVELOPMENT OF KNOWLEDGE MANAGEMENT BASED ON OPEN-SOURCE CONTENT MANAGEMENT SYSTEM (CMS)
by: BRIAN HUJUNG ROMADONA (NIM : 13102085); Pembimbing Utama : Dr. Ir. Yatna Yuwana Martawirya; Pembi,