PT.GREAT̉̉S WORK SYSTEM IMPROVEMENT SUGESTION TO SUPPRESS TIME LATENESS IN WATER TURBINE RUNNER MANUFACTURING (PLTMH CIKOTOK RECONDITION PROJECT CASE STUDY)
Fulfilling for inner state renewable energy lately is needed PLTMH is one of many alternative way to generate electricity from renewable energy. To Construct PLTMH we need a water turbine, inside a water turbine there is a main component called runner. Currently in Indonesia, PT.GREAT is the only co...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/16307 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
id |
id-itb.:16307 |
---|---|
spelling |
id-itb.:163072017-09-27T15:30:47ZPT.GREAT̉̉S WORK SYSTEM IMPROVEMENT SUGESTION TO SUPPRESS TIME LATENESS IN WATER TURBINE RUNNER MANUFACTURING (PLTMH CIKOTOK RECONDITION PROJECT CASE STUDY) HATREZTYO (NIM : 29107325); Pembimbing : Dr.-Ing. Ir. Indra Djodikusumo, LUCKY Indonesia Theses INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/16307 Fulfilling for inner state renewable energy lately is needed PLTMH is one of many alternative way to generate electricity from renewable energy. To Construct PLTMH we need a water turbine, inside a water turbine there is a main component called runner. Currently in Indonesia, PT.GREAT is the only company that can made a runner. During it manufacture activities to made a runner PT.GREAT always face latency problem. <br /> <br /> <br /> This research is meant to help PT.GREAT to make a work system and solution for latency in runner manufacture. To indentify what is the root problem for this latency, writer started it research by making WBS to know what activities that connected to runner manufacturing , after that writer use CPM to identify and analyze work time, analyze result shows that latency potential came from PT.TULUS KARYA UTAMA as a casting component manufactured. <br /> <br /> <br /> The conclusion from this final project is that the latency can be reduce in many ways accordingly. Here things to do , fastened PT.GREAT works at beginning of the project to buy some time for next process, made a monitoring schedule for PT.TULUS kARYA UTAMA, and last one if there is latency we can fastened assembly process accordingly. This there solution is connected each other , but please be informed that this there alternative needs allocation for money and man power to do. text |
institution |
Institut Teknologi Bandung |
building |
Institut Teknologi Bandung Library |
continent |
Asia |
country |
Indonesia Indonesia |
content_provider |
Institut Teknologi Bandung |
collection |
Digital ITB |
language |
Indonesia |
description |
Fulfilling for inner state renewable energy lately is needed PLTMH is one of many alternative way to generate electricity from renewable energy. To Construct PLTMH we need a water turbine, inside a water turbine there is a main component called runner. Currently in Indonesia, PT.GREAT is the only company that can made a runner. During it manufacture activities to made a runner PT.GREAT always face latency problem. <br />
<br />
<br />
This research is meant to help PT.GREAT to make a work system and solution for latency in runner manufacture. To indentify what is the root problem for this latency, writer started it research by making WBS to know what activities that connected to runner manufacturing , after that writer use CPM to identify and analyze work time, analyze result shows that latency potential came from PT.TULUS KARYA UTAMA as a casting component manufactured. <br />
<br />
<br />
The conclusion from this final project is that the latency can be reduce in many ways accordingly. Here things to do , fastened PT.GREAT works at beginning of the project to buy some time for next process, made a monitoring schedule for PT.TULUS kARYA UTAMA, and last one if there is latency we can fastened assembly process accordingly. This there solution is connected each other , but please be informed that this there alternative needs allocation for money and man power to do. |
format |
Theses |
author |
HATREZTYO (NIM : 29107325); Pembimbing : Dr.-Ing. Ir. Indra Djodikusumo, LUCKY |
spellingShingle |
HATREZTYO (NIM : 29107325); Pembimbing : Dr.-Ing. Ir. Indra Djodikusumo, LUCKY PT.GREAT̉̉S WORK SYSTEM IMPROVEMENT SUGESTION TO SUPPRESS TIME LATENESS IN WATER TURBINE RUNNER MANUFACTURING (PLTMH CIKOTOK RECONDITION PROJECT CASE STUDY) |
author_facet |
HATREZTYO (NIM : 29107325); Pembimbing : Dr.-Ing. Ir. Indra Djodikusumo, LUCKY |
author_sort |
HATREZTYO (NIM : 29107325); Pembimbing : Dr.-Ing. Ir. Indra Djodikusumo, LUCKY |
title |
PT.GREAT̉̉S WORK SYSTEM IMPROVEMENT SUGESTION TO SUPPRESS TIME LATENESS IN WATER TURBINE RUNNER MANUFACTURING (PLTMH CIKOTOK RECONDITION PROJECT CASE STUDY) |
title_short |
PT.GREAT̉̉S WORK SYSTEM IMPROVEMENT SUGESTION TO SUPPRESS TIME LATENESS IN WATER TURBINE RUNNER MANUFACTURING (PLTMH CIKOTOK RECONDITION PROJECT CASE STUDY) |
title_full |
PT.GREAT̉̉S WORK SYSTEM IMPROVEMENT SUGESTION TO SUPPRESS TIME LATENESS IN WATER TURBINE RUNNER MANUFACTURING (PLTMH CIKOTOK RECONDITION PROJECT CASE STUDY) |
title_fullStr |
PT.GREAT̉̉S WORK SYSTEM IMPROVEMENT SUGESTION TO SUPPRESS TIME LATENESS IN WATER TURBINE RUNNER MANUFACTURING (PLTMH CIKOTOK RECONDITION PROJECT CASE STUDY) |
title_full_unstemmed |
PT.GREAT̉̉S WORK SYSTEM IMPROVEMENT SUGESTION TO SUPPRESS TIME LATENESS IN WATER TURBINE RUNNER MANUFACTURING (PLTMH CIKOTOK RECONDITION PROJECT CASE STUDY) |
title_sort |
pt.greatãâãâs work system improvement sugestion to suppress time lateness in water turbine runner manufacturing (pltmh cikotok recondition project case study) |
url |
https://digilib.itb.ac.id/gdl/view/16307 |
_version_ |
1820745340814360576 |