PT.GREAT̉̉S WORK SYSTEM IMPROVEMENT SUGESTION TO SUPPRESS TIME LATENESS IN WATER TURBINE RUNNER MANUFACTURING (PLTMH CIKOTOK RECONDITION PROJECT CASE STUDY)
Fulfilling for inner state renewable energy lately is needed PLTMH is one of many alternative way to generate electricity from renewable energy. To Construct PLTMH we need a water turbine, inside a water turbine there is a main component called runner. Currently in Indonesia, PT.GREAT is the only co...
Saved in:
Main Author: | HATREZTYO (NIM : 29107325); Pembimbing : Dr.-Ing. Ir. Indra Djodikusumo, LUCKY |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/16307 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
DESIGN AND MANUFACTURE OF FIXTURES FOR THE ASSEMBLY OF FRANCIS TURBINE RUNNER
by: SATRIO ADITOMO. A (NIM : 13104040); Pembimbing : Dr. Ing. Ir. Indra Djodikusumo, R. -
MEASUREMENT OF FRANCIS TURBINE RUNNER OUTLET OPENING USING LASER SCANNER
by: SEPTIAN (NIM : 13104158); Pembimbing Utama: Dr. Ing. Ir. Indra Djodikusumo, FAHMI -
MEASUREMENT OF FRANCIS TURBINE RUNNER INLET OPENING USING LASER SCANNER
by: ABDURRAHMAN (NIM : 13104009); Pembimbing Utama : Dr. Ing. Ir. Indra Djodikusumo, GUGUN -
Studi potensi dan kelayakan pemanfaatan mata air untuk PLTMH dengan turbin open flume runner ganda di kabupaten Klaten
by: , SUPARDI, Bibit, et al.
Published: (2008) -
A project feasibility study on earthmover tire reconditioning project
by: Dy, Exequiel M.
Published: (1978)