PT.GREAT’S WORK SYSTEM IMPROVEMENT SUGESTION TO SUPPRESS TIME LATENESS IN WATER TURBINE RUNNER MANUFACTURING (PLTMH CIKOTOK RECONDITION PROJECT CASE STUDY)

Fulfilling for inner state renewable energy lately is needed PLTMH is one of many alternative way to generate electricity from renewable energy. To Construct PLTMH we need a water turbine, inside a water turbine there is a main component called runner. Currently in Indonesia, PT.GREAT is the only co...

Full description

Saved in:
Bibliographic Details
Main Author: HATREZTYO (NIM : 29107325); Pembimbing : Dr.-Ing. Ir. Indra Djodikusumo, LUCKY
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/16307
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia

Similar Items