STUDI POTENSI DAN PENGEMBANGAN SISTEM PLTMH DI INDONESIA TIMUR SERTA RANCANG BANGUN SISTEM TURBIN BANKI SEBAGAI SARANA DIKLAT PADA PPPPTK/VEDC MALANG

Along with low of electrification in Indonesia, more specifically in Eastern Indonesia, so that environmentally-friendly and renewable alternative energy sources such as solar energy power plant, wind power plant, and hydro power plant, so that needed to be widely developed in Indonesia. This is con...

Full description

Saved in:
Bibliographic Details
Main Authors: , SUWARTO JATI KUSUMA, , Dr.-Ing.Ir. Agus Maryono
Format: Theses and Dissertations NonPeerReviewed
Published: [Yogyakarta] : Universitas Gadjah Mada 2011
Subjects:
ETD
Online Access:https://repository.ugm.ac.id/91032/
http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=53382
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universitas Gadjah Mada