FEASIBILITY STUDY SAROLANGUN – JENE CRUDE OIL TRANSPORTATION SYSTEM

As one of oil producer in the world, Indonesia have some oil wells. One of crude oil well in Indonesia is at Sarolangun, Jambi. Over time, crude oil production capacity in the Sarolangun Well increased along with increasing market demand so that needed a new transportation system for transporting cr...

Full description

Saved in:
Bibliographic Details
Main Author: ALIFIANI (NIM : 13106067); Dosen Pembimbing : Prof. Dr. Ir. IGN Wiratmaja Puja, LUTHFI
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/16319
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:16319
spelling id-itb.:163192017-09-27T10:40:59ZFEASIBILITY STUDY SAROLANGUN – JENE CRUDE OIL TRANSPORTATION SYSTEM ALIFIANI (NIM : 13106067); Dosen Pembimbing : Prof. Dr. Ir. IGN Wiratmaja Puja, LUTHFI Indonesia Final Project INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/16319 As one of oil producer in the world, Indonesia have some oil wells. One of crude oil well in Indonesia is at Sarolangun, Jambi. Over time, crude oil production capacity in the Sarolangun Well increased along with increasing market demand so that needed a new transportation system for transporting crude oil to a collecting station in Jene to support the increased crude oil production capacity. <br /> <br /> In this rearch, a feasibility study is done considering the technical aspect and economic aspect of the oil pipeline from Muara Beliti to Jene (part of Sarolangun – Jene). Routes selection was using Google Earth software , as well as the determination of nominal pipe sizes was using HYSYS software are conducted for the assessment of technical feasibility. For the assessment of economic feasibility, a cash flow projection was made and others economic parameter such as IRR, POT, NPV and Toll Fee were calculated <br /> <br /> Based on technical analysis conducted in this research, there are 11 alternative routes for the crude oil transportation from Muara Beliti to Jene. Considering all aspect, pipeline route from Semambang to Jene rank with NPS 4’’, toll fee off 0.56 US$/BBL, and the flow rate of 8000 BOPD is the highest among all. The lower the flow rate capacity of the pipeline in every route (0,79 times), then it will have higher toll fee (1.2 times) compared with a high flow rate capacity. Further studies regarding risk and social aspect are recommended for a better decision in selecting the pipeline routes. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description As one of oil producer in the world, Indonesia have some oil wells. One of crude oil well in Indonesia is at Sarolangun, Jambi. Over time, crude oil production capacity in the Sarolangun Well increased along with increasing market demand so that needed a new transportation system for transporting crude oil to a collecting station in Jene to support the increased crude oil production capacity. <br /> <br /> In this rearch, a feasibility study is done considering the technical aspect and economic aspect of the oil pipeline from Muara Beliti to Jene (part of Sarolangun – Jene). Routes selection was using Google Earth software , as well as the determination of nominal pipe sizes was using HYSYS software are conducted for the assessment of technical feasibility. For the assessment of economic feasibility, a cash flow projection was made and others economic parameter such as IRR, POT, NPV and Toll Fee were calculated <br /> <br /> Based on technical analysis conducted in this research, there are 11 alternative routes for the crude oil transportation from Muara Beliti to Jene. Considering all aspect, pipeline route from Semambang to Jene rank with NPS 4’’, toll fee off 0.56 US$/BBL, and the flow rate of 8000 BOPD is the highest among all. The lower the flow rate capacity of the pipeline in every route (0,79 times), then it will have higher toll fee (1.2 times) compared with a high flow rate capacity. Further studies regarding risk and social aspect are recommended for a better decision in selecting the pipeline routes.
format Final Project
author ALIFIANI (NIM : 13106067); Dosen Pembimbing : Prof. Dr. Ir. IGN Wiratmaja Puja, LUTHFI
spellingShingle ALIFIANI (NIM : 13106067); Dosen Pembimbing : Prof. Dr. Ir. IGN Wiratmaja Puja, LUTHFI
FEASIBILITY STUDY SAROLANGUN – JENE CRUDE OIL TRANSPORTATION SYSTEM
author_facet ALIFIANI (NIM : 13106067); Dosen Pembimbing : Prof. Dr. Ir. IGN Wiratmaja Puja, LUTHFI
author_sort ALIFIANI (NIM : 13106067); Dosen Pembimbing : Prof. Dr. Ir. IGN Wiratmaja Puja, LUTHFI
title FEASIBILITY STUDY SAROLANGUN – JENE CRUDE OIL TRANSPORTATION SYSTEM
title_short FEASIBILITY STUDY SAROLANGUN – JENE CRUDE OIL TRANSPORTATION SYSTEM
title_full FEASIBILITY STUDY SAROLANGUN – JENE CRUDE OIL TRANSPORTATION SYSTEM
title_fullStr FEASIBILITY STUDY SAROLANGUN – JENE CRUDE OIL TRANSPORTATION SYSTEM
title_full_unstemmed FEASIBILITY STUDY SAROLANGUN – JENE CRUDE OIL TRANSPORTATION SYSTEM
title_sort feasibility study sarolangun ãƒâ€šã‚– jene crude oil transportation system
url https://digilib.itb.ac.id/gdl/view/16319
_version_ 1822018086477234176