CORPORATE PERFORMANCE MANAGEMENT SYSTEM DESIGN AT DAGO ENGINEERING

Dago Engineering (DagoEng) is an engineering consultant. DagoEng main customers are companies exploiting oil and gas (O&G). Consultant business has great prospect, but the business is competitive. DagoEng should maintain its performance to remain in business. There are unsolveable issues thwart...

Full description

Saved in:
Bibliographic Details
Main Author: KOSASIH (NIM: 29107087); Pembimbing :Dr. Ir. Dermawan Wibisono, M.Eng, OKTORIUS
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/16780
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:16780
spelling id-itb.:167802017-09-27T15:30:56ZCORPORATE PERFORMANCE MANAGEMENT SYSTEM DESIGN AT DAGO ENGINEERING KOSASIH (NIM: 29107087); Pembimbing :Dr. Ir. Dermawan Wibisono, M.Eng, OKTORIUS Indonesia Theses INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/16780 Dago Engineering (DagoEng) is an engineering consultant. DagoEng main customers are companies exploiting oil and gas (O&G). Consultant business has great prospect, but the business is competitive. DagoEng should maintain its performance to remain in business. There are unsolveable issues thwart DagoEng advancement, these are: high employees' turn&#8208;over rate, DagoEng unable to determine areas of improvement, poor R&D performance, inconsistent service quality, no customers satisfaction insight, and unable to forecast future income. By using Current Reality Tree (CRT) to analyse issues, it was found that the root causes are: unsatisfactory current performance management system (PMS), company has no legality form, company has not implemented computerized accounting system. Final project focused on designing PMS. <br /> <br /> PMS is designed by analysing business environment conditions and by learning characteristics of a good PMS. These helps to discover DagoEng needs in PMS. The analysis of business environment conditions consist of: external analysis (PEST & 6F) and internal analysis <br /> <br /> <br /> (Structure, Culture, & Resource). Results then summarized in SWOT analysis. Three possible PMS framework, i.e.: BSC, Performance Prism, and IPMS, is evaluated against DagoEng identified needs. IPMS is most suited PMS framework for DagoEng. The next step of the design is choosing performance variables based on IPMS framework. <br /> <br /> IPMS has three perspectives, i.e.: organizational output, internal proces, and resources capability. Organizational output has financial and non financial aspects. Internal process has inovation, working process, and marketing aspects. Resource capability has human resource, technology & infrastructure, and organizational aspects. Performance variables for each aspects are then chosen, i.e.: financial aspect 4 variables, non financial aspect 4 variables, inovation aspect 3 variables, working process 7 variables, marketing aspect 3 variables, human resource aspect 3 variables, technology & infrastructure aspect 3 variables, organizational aspect 4 variables. Measurement indicator, formula, and required data are then selected for each chosen variables. Measurement results are presented in proposed display. Finding show that DagoEng currently doesn't have sufficient data and doesn’t have available reporting system thus performance benchmarking can't be performed yet. <br /> <br /> Implementation plan needs to be supported by: aligning old and new PMS, amending reporting system, allocating necessary resources in implementing PMS, socializing PMS <br /> <br /> program, and displaying PMS measurement result. PMS must follow Measure&#8208;Implement&#8208;Diagnose&#8208;Action cycle consequently to encourage DagoEng continuous improvement inbusiness. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description Dago Engineering (DagoEng) is an engineering consultant. DagoEng main customers are companies exploiting oil and gas (O&G). Consultant business has great prospect, but the business is competitive. DagoEng should maintain its performance to remain in business. There are unsolveable issues thwart DagoEng advancement, these are: high employees' turn&#8208;over rate, DagoEng unable to determine areas of improvement, poor R&D performance, inconsistent service quality, no customers satisfaction insight, and unable to forecast future income. By using Current Reality Tree (CRT) to analyse issues, it was found that the root causes are: unsatisfactory current performance management system (PMS), company has no legality form, company has not implemented computerized accounting system. Final project focused on designing PMS. <br /> <br /> PMS is designed by analysing business environment conditions and by learning characteristics of a good PMS. These helps to discover DagoEng needs in PMS. The analysis of business environment conditions consist of: external analysis (PEST & 6F) and internal analysis <br /> <br /> <br /> (Structure, Culture, & Resource). Results then summarized in SWOT analysis. Three possible PMS framework, i.e.: BSC, Performance Prism, and IPMS, is evaluated against DagoEng identified needs. IPMS is most suited PMS framework for DagoEng. The next step of the design is choosing performance variables based on IPMS framework. <br /> <br /> IPMS has three perspectives, i.e.: organizational output, internal proces, and resources capability. Organizational output has financial and non financial aspects. Internal process has inovation, working process, and marketing aspects. Resource capability has human resource, technology & infrastructure, and organizational aspects. Performance variables for each aspects are then chosen, i.e.: financial aspect 4 variables, non financial aspect 4 variables, inovation aspect 3 variables, working process 7 variables, marketing aspect 3 variables, human resource aspect 3 variables, technology & infrastructure aspect 3 variables, organizational aspect 4 variables. Measurement indicator, formula, and required data are then selected for each chosen variables. Measurement results are presented in proposed display. Finding show that DagoEng currently doesn't have sufficient data and doesn’t have available reporting system thus performance benchmarking can't be performed yet. <br /> <br /> Implementation plan needs to be supported by: aligning old and new PMS, amending reporting system, allocating necessary resources in implementing PMS, socializing PMS <br /> <br /> program, and displaying PMS measurement result. PMS must follow Measure&#8208;Implement&#8208;Diagnose&#8208;Action cycle consequently to encourage DagoEng continuous improvement inbusiness.
format Theses
author KOSASIH (NIM: 29107087); Pembimbing :Dr. Ir. Dermawan Wibisono, M.Eng, OKTORIUS
spellingShingle KOSASIH (NIM: 29107087); Pembimbing :Dr. Ir. Dermawan Wibisono, M.Eng, OKTORIUS
CORPORATE PERFORMANCE MANAGEMENT SYSTEM DESIGN AT DAGO ENGINEERING
author_facet KOSASIH (NIM: 29107087); Pembimbing :Dr. Ir. Dermawan Wibisono, M.Eng, OKTORIUS
author_sort KOSASIH (NIM: 29107087); Pembimbing :Dr. Ir. Dermawan Wibisono, M.Eng, OKTORIUS
title CORPORATE PERFORMANCE MANAGEMENT SYSTEM DESIGN AT DAGO ENGINEERING
title_short CORPORATE PERFORMANCE MANAGEMENT SYSTEM DESIGN AT DAGO ENGINEERING
title_full CORPORATE PERFORMANCE MANAGEMENT SYSTEM DESIGN AT DAGO ENGINEERING
title_fullStr CORPORATE PERFORMANCE MANAGEMENT SYSTEM DESIGN AT DAGO ENGINEERING
title_full_unstemmed CORPORATE PERFORMANCE MANAGEMENT SYSTEM DESIGN AT DAGO ENGINEERING
title_sort corporate performance management system design at dago engineering
url https://digilib.itb.ac.id/gdl/view/16780
_version_ 1820745454847000576