OPTIMALISASI DURASI IDLE “MEAL AND PRAY” CATERPILLAR 785 DAY SHIFT PIT HATARI PT. KALTIM PRIMA COAL

PT Kaltim Prima Coal is one of the biggest coal company in Indonesia with target of coal production is close to 32 billion for 2007. In achieving the target, great diggers combined with great productivity of trucks are essential. One of aspects influencing equipment’s productivity is delay and id...

Full description

Saved in:
Bibliographic Details
Main Author: NOVE PUTRA (NIM 12103028); Pembimbing : Dr. Ganda Marihot Simangunsong, ST., MT., RADJA
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/16887
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia

Similar Items