OPTIMALISASI DURASI IDLE ̉̉MEAL AND PRAỶ̉ CATERPILLAR 785 DAY SHIFT PIT HATARI PT. KALTIM PRIMA COAL
PT Kaltim Prima Coal is one of the biggest coal company in Indonesia with target of coal production is close to 32 billion for 2007. In achieving the target, great diggers combined with great productivity of trucks are essential. One of aspects influencing equipment’s productivity is delay and id...
Saved in:
Main Author: | NOVE PUTRA (NIM 12103028); Pembimbing : Dr. Ganda Marihot Simangunsong, ST., MT., RADJA |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/16887 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
Existence of independent [1, 2]-sets in caterpillars
by: Santoso, Eko Budi, et al.
Published: (2016)
by: Santoso, Eko Budi, et al.
Published: (2016)
Similar Items
-
Motion planning and simulation of a caterpillar robot
by: Seethapathy Janarthanan.
Published: (2008) -
Caterpillars and butterflies
by: Manalastas, Pia Redempta T.
Published: (2021) -
On the Rainbow Mean Indexes of Caterpillars
by: Garciano, Agnes, et al.
Published: (2023) -
A study on the distribution of lead and mercury in the lower section of the Chao-Praya River
by: Pichan Sawangwong
Published: (2014) -
Predation on artificial nests and caterpillar models across a disturbance gradient in Subic Bay, Philippines
by: Posa, M.R.C., et al.
Published: (2014)