#TITLE_ALTERNATIVE#
Earth Retaining Structure has widely used as temporary structure such as; basement cut and covers excavation. Temporary Earth Retaining structure has main function as temporary or used during construction. Permeability of clay has average 1.10-5 until 1.10-10 m/sec2, it means in relative short time...
Saved in:
Main Author: | SARGAWI (NIM : 25008043); Pembimbing : Ir. Endra Susila, Ph.D.; Ir. Erza Rismantojo, Ph.D, RIVAI |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/17044 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
#TITLE_ALTERNATIVE#
by: (NIM : 250 07 032); Pembimbing I : Endra Susila, Ph.D; Pembimbing II : Erza Rismantojo,, SUHERMANTO -
#TITLE_ALTERNATIVE#
by: SANUSI (NIM. 150070280); Pembimbing : Endra Susila, S.T., M.T.,Ph.D., AMRI -
#TITLE_ALTERNATIVE#
by: DWI PERKASA (NIM : 15007110) ; Pembimbing : Endra Susila ST., MT., Ph.D., ALDIO -
#TITLE_ALTERNATIVE#
by: W. F. TARIGAN (NIM : 15007159); Pembimbing : Endra Susila, S.T., M.T., Ph.D., ARIANDI -
#TITLE_ALTERNATIVE#
by: MULROSHA( NIM : 15005054) Pembimbing :Endra Susila, S.T., Ph. D, ANDIKA