OPERATIONAL RISK MANAGEMENT AT CRUSHER MASTER PLAN PROJECT PT FREEPORT INDONESIA
PT Freeport Indonesia, an international mining company, under concentrating division, decided to do expansion on crusher plant with capital of $49 millions. PT Freeport Indonesia had done numbers of expansion project since 1988. This expansion objectives are to anticipate underground mine increase p...
Saved in:
Main Author: | NUGROHO (NIM : 29107127); Pembimbing: Ir. RUDY BEKTI, MM, SETIA |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/17205 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
THE ANALYSIS OF PROJECT COMPLETION DELAY ALONG WITH THE RECOMMENDATION OF THE SYSTEM AND PROCEDURE TO HANDLE IT AT PT. Z (CASE STUDY: CRUSHER MASTER PLAN PROJECT)
by: ULYA HIDAYAT (NIM: 29107144), AKHMAD -
THE EVALUATION ON COOPERATION (OUTSOURCING) BETWEEN PT FREEPORT INDONESIA AND PT XYZ AT SURFACE MINE PT FREEPORT INDONESIA
by: FAIZAL (NIM: 29107148) ; Pembimbing: Alibasjah Inggriantara Soedjarno, MM, MUHAMAD -
EVALUATION ON PLANNING AND CONTROLLING PINANG ̉̉ PAGER GAS TRANSMISSION LINE REPLACEMENT PROJECT IN PT. CHEVRON PACIFIC INDONESIA
by: ZAINUDDIN (NIM : 29106380); Pembimbing: Ir. Rudy Bekti, MM , AHMAD -
Automated Reverse Vending Aluminum Can Crusher (ARVACC)
by: Cham, Aileen Kristel B., et al.
Published: (2007) -
BLASTING FRAGMENT MATERIAL ANALYSIS IN CRUSHER AND EVALUATION OF BLASTING PATTERN OF D QUARRY, PT. X
by: RIFKY G.M. (NIM 12103050), AKBAR