FAILURE MODES AND EFFECTS ANALYSIS IMPLEMENTING ON PLTGU PT BEKASI POWER’S HEAT RECOVERY STEAM GENERATOR

The consumption of electricity as one of main necessities in human daily life is increasing along with the development of technology and the increase of human <br /> <br /> <br /> dependency of electricity. Thus, a reliable power plant is needed to solve this problem. <br...

Full description

Saved in:
Bibliographic Details
Main Author: HIRAS PASARIBU (NIM : 13106060); Tim Pembimbing : Dr. FX Sangriyadi Setio dan Prof. Wiranto Ar, DHENY
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/17411
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:17411
spelling id-itb.:174112017-09-27T10:41:00ZFAILURE MODES AND EFFECTS ANALYSIS IMPLEMENTING ON PLTGU PT BEKASI POWER’S HEAT RECOVERY STEAM GENERATOR HIRAS PASARIBU (NIM : 13106060); Tim Pembimbing : Dr. FX Sangriyadi Setio dan Prof. Wiranto Ar, DHENY Indonesia Final Project INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/17411 The consumption of electricity as one of main necessities in human daily life is increasing along with the development of technology and the increase of human <br /> <br /> <br /> dependency of electricity. Thus, a reliable power plant is needed to solve this problem. <br /> <br /> <br /> Large amount electrical consumption of Kota Jababeka as both industrial and residential area is the most challenging problem for Kota Jababeka’s administrator who establishes PT Bekasi Power that operates 130MW Gas and <br /> <br /> <br /> Steam Power Plant with the intension of becoming an alternative solution for industrial area electrical consumption. In order to maintain its reliability, the right maintenance procedure called Reliability Centered Maintenance (RCM) has to be implemented. <br /> <br /> <br /> Failure Mode and Effect Analysis (FMEA) method on heat recovery steam generator in PLTGU Bekasi Power was implemented in this research. The identification of failure mode, probable failure cause and the probable failure effect were firstly done. Afterwards, FMEA was made and Risk Priority Number (RPN) for HRSG was calculated in order to determine which failure mode should has priorities over the other one. At last, according to RPN number and FMEA decision chart, the suitable maintenance method is determined for this power plant to maintain its reliability. The suggested method in this research is expected to be a reference maintenance method, not only in PT Bekasi Power later, but also for anyone who might need to use it in the future. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description The consumption of electricity as one of main necessities in human daily life is increasing along with the development of technology and the increase of human <br /> <br /> <br /> dependency of electricity. Thus, a reliable power plant is needed to solve this problem. <br /> <br /> <br /> Large amount electrical consumption of Kota Jababeka as both industrial and residential area is the most challenging problem for Kota Jababeka’s administrator who establishes PT Bekasi Power that operates 130MW Gas and <br /> <br /> <br /> Steam Power Plant with the intension of becoming an alternative solution for industrial area electrical consumption. In order to maintain its reliability, the right maintenance procedure called Reliability Centered Maintenance (RCM) has to be implemented. <br /> <br /> <br /> Failure Mode and Effect Analysis (FMEA) method on heat recovery steam generator in PLTGU Bekasi Power was implemented in this research. The identification of failure mode, probable failure cause and the probable failure effect were firstly done. Afterwards, FMEA was made and Risk Priority Number (RPN) for HRSG was calculated in order to determine which failure mode should has priorities over the other one. At last, according to RPN number and FMEA decision chart, the suitable maintenance method is determined for this power plant to maintain its reliability. The suggested method in this research is expected to be a reference maintenance method, not only in PT Bekasi Power later, but also for anyone who might need to use it in the future.
format Final Project
author HIRAS PASARIBU (NIM : 13106060); Tim Pembimbing : Dr. FX Sangriyadi Setio dan Prof. Wiranto Ar, DHENY
spellingShingle HIRAS PASARIBU (NIM : 13106060); Tim Pembimbing : Dr. FX Sangriyadi Setio dan Prof. Wiranto Ar, DHENY
FAILURE MODES AND EFFECTS ANALYSIS IMPLEMENTING ON PLTGU PT BEKASI POWER’S HEAT RECOVERY STEAM GENERATOR
author_facet HIRAS PASARIBU (NIM : 13106060); Tim Pembimbing : Dr. FX Sangriyadi Setio dan Prof. Wiranto Ar, DHENY
author_sort HIRAS PASARIBU (NIM : 13106060); Tim Pembimbing : Dr. FX Sangriyadi Setio dan Prof. Wiranto Ar, DHENY
title FAILURE MODES AND EFFECTS ANALYSIS IMPLEMENTING ON PLTGU PT BEKASI POWER’S HEAT RECOVERY STEAM GENERATOR
title_short FAILURE MODES AND EFFECTS ANALYSIS IMPLEMENTING ON PLTGU PT BEKASI POWER’S HEAT RECOVERY STEAM GENERATOR
title_full FAILURE MODES AND EFFECTS ANALYSIS IMPLEMENTING ON PLTGU PT BEKASI POWER’S HEAT RECOVERY STEAM GENERATOR
title_fullStr FAILURE MODES AND EFFECTS ANALYSIS IMPLEMENTING ON PLTGU PT BEKASI POWER’S HEAT RECOVERY STEAM GENERATOR
title_full_unstemmed FAILURE MODES AND EFFECTS ANALYSIS IMPLEMENTING ON PLTGU PT BEKASI POWER’S HEAT RECOVERY STEAM GENERATOR
title_sort failure modes and effects analysis implementing on pltgu pt bekasi powerãƒâ€šã‚’s heat recovery steam generator
url https://digilib.itb.ac.id/gdl/view/17411
_version_ 1820745598512398336