#TITLE_ALTERNATIVE#

South Ciurug, one of mine at Gold Mining Business Unit of Pongkor, PT. ANTAM, Tbk, will be developed to reach level under elevation of 500. Ramp-down have to develop as transportation media which connect levels on mine, to fulfill this porpose. Geotechnical investigation are needed to grasph rock ma...

Full description

Saved in:
Bibliographic Details
Main Author: AGUSTINUS RABUDIANTO (NIM 12104006), TYAS
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/17477
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia