#TITLE_ALTERNATIVE#
South Ciurug, one of mine at Gold Mining Business Unit of Pongkor, PT. ANTAM, Tbk, will be developed to reach level under elevation of 500. Ramp-down have to develop as transportation media which connect levels on mine, to fulfill this porpose. Geotechnical investigation are needed to grasph rock ma...
Saved in:
Main Author: | AGUSTINUS RABUDIANTO (NIM 12104006), TYAS |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/17477 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
#TITLE_ALTERNATIVE#
by: ZANDY (NIM 13003073), AGUSTINUS -
#TITLE_ALTERNATIVE#
by: AGUSTINUS SUSANTO (NIM 10105011), ERIK -
#TITLE_ALTERNATIVE#
by: RANGGA KRISTIANTO (NIM 10104075), TYAS -
#TITLE_ALTERNATIVE#
by: HANDY UTAMA, AGUSTINUS -
#TITLE_ALTERNATIVE#
by: (NIM:15206059); Pembimbing : Dr.Ir. Agustinus Adib Abadi, MSc.; Dr.Ir. Agustinus Adib Abadi, , ALVIAN