A PROPOSAL OF AGGREGATE PRODUCTION PLANNING OF ANGKLUNG IN PT. SAUNG ANGKLUNG UDJO

Angklung is a musical instrument made of bamboo from West Java that have announced as one of the educational instruments by the regional government of West Java Province. The provision caused the increasing demand of angklung over the years. The increasing demand gives rise to demand of PT. Saung An...

Full description

Saved in:
Bibliographic Details
Main Author: SYAHESY (NIM: 29107306); Pembimbing: Dr. Ir. Gatot Yudoko, VEBBY
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/17493
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:17493
spelling id-itb.:174932017-09-27T15:30:49ZA PROPOSAL OF AGGREGATE PRODUCTION PLANNING OF ANGKLUNG IN PT. SAUNG ANGKLUNG UDJO SYAHESY (NIM: 29107306); Pembimbing: Dr. Ir. Gatot Yudoko, VEBBY Indonesia Theses INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/17493 Angklung is a musical instrument made of bamboo from West Java that have announced as one of the educational instruments by the regional government of West Java Province. The provision caused the increasing demand of angklung over the years. The increasing demand gives rise to demand of PT. Saung Angklung Udjo (SAU) as the <br /> <br /> <br /> biggest angklung producer in West Java and caused lacking in capacity of SAU to fulfill the demand from customers without ignore the quality issue. SAU adopt the partnership system in producing angklung. Based on observation, the disability in fulfilling the demand from customers was caused by the limitation number of craftpeople, especially the strain man, the core of every craftpeople group. Becoming a good tone man will need 1-5 years in learning. The limitation drives SAU to <br /> <br /> <br /> optimized the existing capacity to fulfill the demand in a certain time. In order to formulate the mid term aggregate production planning, an initial observation was done by discussion and interviews with management of SAU and craftpeople group. The data gathering, such as demand, cost pricing and existing capacity was done by direct observation and from the historical data. Based on this data, we formalize a Master Production Schedule (MPS) that will become the input for compiling the Rough Cut Capacity Planning (RCCP). The objective of RCCP are to compare the existing capacity and the required capacity of SAU and how much the cost to fulfill the 12 period demand (1 year), from June 2009 to May 2010. <br /> <br /> <br /> From the result of RCCP, we conclude that the lack of capacity occur to angklung sarinande and unit besar only, and the cost to fulfill the next 1 year demand is <br /> <br /> <br /> Rp 2.467.656.073. The recommendation to deal with the lack of capacity are adding the number of craftpeople group, especially the craftpeople from Tasikmalaya and Ciamis, and using the excess capacity of other product to help to produce angklung sarinande and unit besar. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description Angklung is a musical instrument made of bamboo from West Java that have announced as one of the educational instruments by the regional government of West Java Province. The provision caused the increasing demand of angklung over the years. The increasing demand gives rise to demand of PT. Saung Angklung Udjo (SAU) as the <br /> <br /> <br /> biggest angklung producer in West Java and caused lacking in capacity of SAU to fulfill the demand from customers without ignore the quality issue. SAU adopt the partnership system in producing angklung. Based on observation, the disability in fulfilling the demand from customers was caused by the limitation number of craftpeople, especially the strain man, the core of every craftpeople group. Becoming a good tone man will need 1-5 years in learning. The limitation drives SAU to <br /> <br /> <br /> optimized the existing capacity to fulfill the demand in a certain time. In order to formulate the mid term aggregate production planning, an initial observation was done by discussion and interviews with management of SAU and craftpeople group. The data gathering, such as demand, cost pricing and existing capacity was done by direct observation and from the historical data. Based on this data, we formalize a Master Production Schedule (MPS) that will become the input for compiling the Rough Cut Capacity Planning (RCCP). The objective of RCCP are to compare the existing capacity and the required capacity of SAU and how much the cost to fulfill the 12 period demand (1 year), from June 2009 to May 2010. <br /> <br /> <br /> From the result of RCCP, we conclude that the lack of capacity occur to angklung sarinande and unit besar only, and the cost to fulfill the next 1 year demand is <br /> <br /> <br /> Rp 2.467.656.073. The recommendation to deal with the lack of capacity are adding the number of craftpeople group, especially the craftpeople from Tasikmalaya and Ciamis, and using the excess capacity of other product to help to produce angklung sarinande and unit besar.
format Theses
author SYAHESY (NIM: 29107306); Pembimbing: Dr. Ir. Gatot Yudoko, VEBBY
spellingShingle SYAHESY (NIM: 29107306); Pembimbing: Dr. Ir. Gatot Yudoko, VEBBY
A PROPOSAL OF AGGREGATE PRODUCTION PLANNING OF ANGKLUNG IN PT. SAUNG ANGKLUNG UDJO
author_facet SYAHESY (NIM: 29107306); Pembimbing: Dr. Ir. Gatot Yudoko, VEBBY
author_sort SYAHESY (NIM: 29107306); Pembimbing: Dr. Ir. Gatot Yudoko, VEBBY
title A PROPOSAL OF AGGREGATE PRODUCTION PLANNING OF ANGKLUNG IN PT. SAUNG ANGKLUNG UDJO
title_short A PROPOSAL OF AGGREGATE PRODUCTION PLANNING OF ANGKLUNG IN PT. SAUNG ANGKLUNG UDJO
title_full A PROPOSAL OF AGGREGATE PRODUCTION PLANNING OF ANGKLUNG IN PT. SAUNG ANGKLUNG UDJO
title_fullStr A PROPOSAL OF AGGREGATE PRODUCTION PLANNING OF ANGKLUNG IN PT. SAUNG ANGKLUNG UDJO
title_full_unstemmed A PROPOSAL OF AGGREGATE PRODUCTION PLANNING OF ANGKLUNG IN PT. SAUNG ANGKLUNG UDJO
title_sort proposal of aggregate production planning of angklung in pt. saung angklung udjo
url https://digilib.itb.ac.id/gdl/view/17493
_version_ 1820745617488478208