#TITLE_ALTERNATIVE#
Crew assignment problem is an essential problemn in airlines, moreoverit is related to the crew managerial cost which takes a large amount. Numerous employee rules <br /> <br /> <br /> in the company makes the crew schedulling problem very complex. <br /> <br /> <...
Saved in:
Main Author: | WARNITA (NIM : 10107003); Dosen Pembimbing : Dr. Rieske Hadianti, WIDA |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/17547 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
#TITLE_ALTERNATIVE#
by: TAFWIDLI (NIM : 13707039); Dosen Pembimbing :Dr. Ir. Bambang Sunendar, FAHMI
by: TAFWIDLI (NIM : 13707039); Dosen Pembimbing :Dr. Ir. Bambang Sunendar, FAHMI
Similar Items
-
#TITLE_ALTERNATIVE#
by: IRAWATI (NIM 10107079); Pembimbing : Dr. Rieske Hadianti, ADE -
#TITLE_ALTERNATIVE#
by: WIJAYANTI (NIM 10107074); Pembimbing : Dr. Rieske Hadianti, WIDYA -
#TITLE_ALTERNATIVE#
by: PUSPITASARI (NIM 10107051); Pembimbing : Dr. Rieske Hadianti, RIZKA -
#TITLE_ALTERNATIVE#
by: DWI RAHAYU (NIM 10107045); Pembimbing : Dr. Rieske Hadianti, IMANIAR -
#TITLE_ALTERNATIVE#
by: DESRINA MUNAF (NIM : 10105014); Pembimbing : Dr. Rieske Hadianti, ANISA