PERFORMANCE EVALUATION TRAIN OPERATION ( Case Study : Jakarta Kota, Gambir, Manggarai, Jatinegara )

Railway is transport mode that has special character and advantages especially the ability to transport passengers and goods in large numbers, less energy consuming, less in space consuming, high safety level and environment friendly (less polluted). But railway often facing the problems along the t...

Full description

Saved in:
Bibliographic Details
Main Author: AMRIFA (NIM : 25007028); Pembimbing : Ir. Sri Hendarto.,M.Sc ; Ir. Titi Liliani, M.Sc, YANDRIE
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/17609
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:17609
spelling id-itb.:176092017-09-27T15:29:56ZPERFORMANCE EVALUATION TRAIN OPERATION ( Case Study : Jakarta Kota, Gambir, Manggarai, Jatinegara ) AMRIFA (NIM : 25007028); Pembimbing : Ir. Sri Hendarto.,M.Sc ; Ir. Titi Liliani, M.Sc, YANDRIE Indonesia Theses INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/17609 Railway is transport mode that has special character and advantages especially the ability to transport passengers and goods in large numbers, less energy consuming, less in space consuming, high safety level and environment friendly (less polluted). But railway often facing the problems along the trip which caused some difficulties in managing the railway tip scheduling. <br /> <br /> <br /> <br /> <br /> Train Stations such as Jakarta Kota, Gambir, Manggarai and Jatinegara are the ones that frequently facing the problems in railway trip . <br /> <br /> <br /> <br /> <br /> Jakarta Kota, Gambir, Manggarai, and Jatinegara Station is a large stations that are experiencing delays in the schedule. The delay factors are: (i) no additional time in treatment railway in the day-to-day, (ii) The number of crosses and queue at large stations, (iii) Traffic Capacity calculations using the equation H = (120 x B x 60 / V) + t; C = (24 x 60) / H .The results are not the same as the existing traffic capacity on GAPEKA 2008 primarily during rush hour. <br /> <br /> <br /> <br /> <br /> Completion of the following scenarios by changing the variable-speed fox. The value of the block, and the type of signals to the same value of traffic capacity. Jakarta Kota – Gambir link or Gambir - Jakarta Kota link V = 60 km / h; B = 0.45 km; t = 0.25 m. Gambir - Manggarai or Manggarai - Gambir V = 80 km / h; B = 0.5 km; t = 0.25 m. Manggarai - Jatinegara or Jatinegara - Manggarai in to V = 60 km / h; B = 0.65 km; t = 0.75 m. <br /> <br /> <br /> <br /> <br /> Occurrence of schedule differences between existing conditions and planning (GAPEKA 2008) which have an impact on traffic capacity reduction, where the capacity of field operations across inappropriate or less than the traffic capacity planning (GAPEKA) is caused by several things. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description Railway is transport mode that has special character and advantages especially the ability to transport passengers and goods in large numbers, less energy consuming, less in space consuming, high safety level and environment friendly (less polluted). But railway often facing the problems along the trip which caused some difficulties in managing the railway tip scheduling. <br /> <br /> <br /> <br /> <br /> Train Stations such as Jakarta Kota, Gambir, Manggarai and Jatinegara are the ones that frequently facing the problems in railway trip . <br /> <br /> <br /> <br /> <br /> Jakarta Kota, Gambir, Manggarai, and Jatinegara Station is a large stations that are experiencing delays in the schedule. The delay factors are: (i) no additional time in treatment railway in the day-to-day, (ii) The number of crosses and queue at large stations, (iii) Traffic Capacity calculations using the equation H = (120 x B x 60 / V) + t; C = (24 x 60) / H .The results are not the same as the existing traffic capacity on GAPEKA 2008 primarily during rush hour. <br /> <br /> <br /> <br /> <br /> Completion of the following scenarios by changing the variable-speed fox. The value of the block, and the type of signals to the same value of traffic capacity. Jakarta Kota – Gambir link or Gambir - Jakarta Kota link V = 60 km / h; B = 0.45 km; t = 0.25 m. Gambir - Manggarai or Manggarai - Gambir V = 80 km / h; B = 0.5 km; t = 0.25 m. Manggarai - Jatinegara or Jatinegara - Manggarai in to V = 60 km / h; B = 0.65 km; t = 0.75 m. <br /> <br /> <br /> <br /> <br /> Occurrence of schedule differences between existing conditions and planning (GAPEKA 2008) which have an impact on traffic capacity reduction, where the capacity of field operations across inappropriate or less than the traffic capacity planning (GAPEKA) is caused by several things.
format Theses
author AMRIFA (NIM : 25007028); Pembimbing : Ir. Sri Hendarto.,M.Sc ; Ir. Titi Liliani, M.Sc, YANDRIE
spellingShingle AMRIFA (NIM : 25007028); Pembimbing : Ir. Sri Hendarto.,M.Sc ; Ir. Titi Liliani, M.Sc, YANDRIE
PERFORMANCE EVALUATION TRAIN OPERATION ( Case Study : Jakarta Kota, Gambir, Manggarai, Jatinegara )
author_facet AMRIFA (NIM : 25007028); Pembimbing : Ir. Sri Hendarto.,M.Sc ; Ir. Titi Liliani, M.Sc, YANDRIE
author_sort AMRIFA (NIM : 25007028); Pembimbing : Ir. Sri Hendarto.,M.Sc ; Ir. Titi Liliani, M.Sc, YANDRIE
title PERFORMANCE EVALUATION TRAIN OPERATION ( Case Study : Jakarta Kota, Gambir, Manggarai, Jatinegara )
title_short PERFORMANCE EVALUATION TRAIN OPERATION ( Case Study : Jakarta Kota, Gambir, Manggarai, Jatinegara )
title_full PERFORMANCE EVALUATION TRAIN OPERATION ( Case Study : Jakarta Kota, Gambir, Manggarai, Jatinegara )
title_fullStr PERFORMANCE EVALUATION TRAIN OPERATION ( Case Study : Jakarta Kota, Gambir, Manggarai, Jatinegara )
title_full_unstemmed PERFORMANCE EVALUATION TRAIN OPERATION ( Case Study : Jakarta Kota, Gambir, Manggarai, Jatinegara )
title_sort performance evaluation train operation ( case study : jakarta kota, gambir, manggarai, jatinegara )
url https://digilib.itb.ac.id/gdl/view/17609
_version_ 1820745644967460864