IMPROVEMENT OF SUPPLIER DELIVERY LEAD TIME IN LOCAL PURCHASING SECTION SUPPLY CHAIN MANAGEMENT PT FREEPORT INDONESIA
In the last quarter of 2008, the world faced global economic slowdown, copper tumbled below US$2 a pound <br /> <br /> <br /> for the first time since December 2005 on speculation that the world economy is headed for a recession that <br /> <br /> <br /> will...
Saved in:
Main Author: | HENDRA SIRINGORINGO (NIM 29107131); Pembimbing: DR. MURSYID HASAN BASRI, YANSEN |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/17614 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
PERBAIKAN LEAD TIME SUPPLIER PADA SEKSI PEMBELIAN LOKAL MANAJEMEN RANTAI PASOK PT. FREEPORT INDONESIA
by: HENDRA SIRINGORINGO (NIM : 29107131); Pembimbing : Dr. Mursyid Hasan Basri, YANSEN -
AVAILABILITY IMPROVEMENT ON NORTH SOUTH CRUSHING PLANT AT PT FREEPORT INDONESIA
by: HASOLOAN LUBIS (NIM: 29107133); Pembimbing: Dr. Ir. Mursyid Hasan Basri, ROBERT -
OPTIMISASI THROUGHPUT PADA ALAT GRAVITASI DI PROSES PENGGILINGAN PT. FREEPORT INDONESIA
by: SAHUREKA (NIM : 29109413); Dosen Pembimbing: Dr. Ir. Mursyid Hasan Basri, FRANS -
Research of supplier evaluation in the supply chain of the construction industry
by: Ricardo Ancona Martinez De Arredondo
Published: (2017) -
Integrated supply chain of supplier and retailer for stochastic demand
by: Tiwari, S., et al.
Published: (2021)