STUDY OF IMPLEMENTATION OF RELIABILITY CENTERED MAINTENANCE (RCM) IN PLTU SURALAYA A STUDY CASE OF PULVERIZER, MPS-89N TYPE, 5-7 UNITS
PLTU Suralaya has 7 steam power plants with total power 3400 MW, has operated for more than 10 years, needs more effective and efficient maintenance system. Maintenance system that runs today tends to use preventive maintenance approach in which the handling of all failure modes in the interval is a...
Saved in:
Main Author: | (NIM : NIM : 23108327); Pembimbing : Prof. Dr. Ir. H. Indra Nurhadi, ZULFADHLI |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/17726 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
RELIABILITY ANALYSIS TO DETERMINED MEAN TIME BETWEEN FAILURE(MTBF) CASE STUDY ON PLTU SURALAYA PULVERIZER
by: DESI ANGGRAENI (NIM : 23108020); Pembimbing : Prof. Dr. Ir. Indra Nurhadi, NUHA -
THE BEGINNING OF RELIABILITY CENTERED MAINTENANCE IMPLEMENTATION (RCM) AT COAL FIRED STEAM GENERATION POWER PLANT (PLTU) LABUAN Case study of Stacker Reclaimer Type DQL 1250/D204
by: SATRIYO (NIM : 23108310); Pembimbing: Prof. DR. Ir. H. Indra Nurhadi, BUDI -
IMPLEMENTATION STUDY OF RELIABILITY CENTERED MAINTENANCE ON BELT CONVEYOR 13 AND 14 SURALAYA POWER PLANT UNIT 1-4
by: ABIDIN (NIM : 23108311); Pembimbing:Prof. Dr. Ir. Indra Nurhadi, ZAINAL -
THE DEVELOPMENT OF A WEB- BASED RELIABILITY CENTERED MAINTENANCE (RCM) SOFTWARE
by: YUSUF (NIM : 23608001), MUHAMAD -
PENGARUH PLUGGING TERHADAP PERHITUNGAN EFEKTIVITAS HEATER
di PLTU Suralaya
by: , ANTONIUS ADI HENDRA SAPUTRA, et al.
Published: (2013)