STUDY OF IMPLEMENTATION OF RELIABILITY CENTERED MAINTENANCE (RCM) IN PLTU SURALAYA A STUDY CASE OF PULVERIZER, MPS-89N TYPE, 5-7 UNITS

PLTU Suralaya has 7 steam power plants with total power 3400 MW, has operated for more than 10 years, needs more effective and efficient maintenance system. Maintenance system that runs today tends to use preventive maintenance approach in which the handling of all failure modes in the interval is a...

Full description

Saved in:
Bibliographic Details
Main Author: (NIM : NIM : 23108327); Pembimbing : Prof. Dr. Ir. H. Indra Nurhadi, ZULFADHLI
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/17726
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
Be the first to leave a comment!
You must be logged in first