ESTIMATION OF LOAD AND HAUL EQUIPMENT NEEDS IN UNDERGROUND MINING DEVELOPMENT ACTIVITIES DEEP MILL LEVEL ZONE PT FREEPORT INDONESIA
Mining activities in underground mining DMLZ (Deep Mill Level Zone) is in production preparation stage (development) now and based on feasibility studies will start its production activities in 2015. Along with the increased activity progress DMLZ tunneling underground <br /> <br /> &l...
Saved in:
Main Author: | SIAHAAN (NIM : 121 06 033); Pembimbing : Dr. Ganda Marihot Simangunsong, S.T., M.T., ABRAM |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/17739 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
Evaluasi sistem pengendalian manajemen di Departemen Mine Underground Construction PT Freeport Indonesia
by: , KUSNADI, David, et al.
Published: (2003) -
Introducing GPS in fleet management of a mine: Impact on hauling cycle time and hauling capacity
by: Chaowasakoo,P., et al.
Published: (2015) -
Introducing GPS in fleet management of a mine: Impact on hauling cycle time and hauling capacity
by: Patarawan Chaowasakoo, et al.
Published: (2018) -
DESIGNING INCENTIVE SYSTEM BY APPLYING INDIVIDUAL SCORECARD TO IMPROVE PRODUCTION QUALITY OF DOZ UNDERGROUND MINE, PT. FREEPORT INDONESIA, PAPUA
by: KURNIAWAN (NIM : 29109135); Pembimbing: Prof. Dr. Ir. Jann Hidajat Tjakraatmadja, MSIE, CAHYA -
THE EVALUATION ON COOPERATION (OUTSOURCING) BETWEEN PT FREEPORT INDONESIA AND PT XYZ AT SURFACE MINE PT FREEPORT INDONESIA
by: FAIZAL (NIM: 29107148) ; Pembimbing: Alibasjah Inggriantara Soedjarno, MM, MUHAMAD