OPTIMIZING VICO INDONESIA INVENTORY SERVICE LEVEL IN MAINTENANCE, REPAIR AND OPERATION (MRO) ACTIVITIES USING DECISION SUPPORT SYSTEM

The trend of oil and gas production is currently declining. This condition is <br /> <br /> <br /> exacerbated with the increasing trend of production cost. Thus, operation production efficiency is going to be the tag line to be solved now and in future decades. One of the messes...

Full description

Saved in:
Bibliographic Details
Main Author: NUGRAHA (NIM : 29110109); Dosen Pembimbing : Yos Sunitiyoso, ST., M.Eng, PhD, ADITYA
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/17790
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:17790
spelling id-itb.:177902017-09-27T15:30:58ZOPTIMIZING VICO INDONESIA INVENTORY SERVICE LEVEL IN MAINTENANCE, REPAIR AND OPERATION (MRO) ACTIVITIES USING DECISION SUPPORT SYSTEM NUGRAHA (NIM : 29110109); Dosen Pembimbing : Yos Sunitiyoso, ST., M.Eng, PhD, ADITYA Indonesia Theses INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/17790 The trend of oil and gas production is currently declining. This condition is <br /> <br /> <br /> exacerbated with the increasing trend of production cost. Thus, operation production efficiency is going to be the tag line to be solved now and in future decades. One of the messes came from the Industry supply chain condition, especially inventory condition. A very large amount of stockpile, dead stock, low turnover ratio and slow moving inventory material has been valid evidence in VICO Indonesia especially in terms of Maintenance, Repair and Operation (MRO). The worst thing happened when the stocked material is insufficient to cover the operation needs or the stocked material is not exactly the materials needed. The above condition leads many operations into halt. Thesewere common things likewise other PSC’s in Indonesia and oil and Gas Company all over the world. Based on the business problems occurred, inefficient and ineffective company's MRO inventory management condition will bring disaster for the company’s goal in future production efficiency. This final project is focused on how to optimize VICO Indonesia inventory management especially in maintenance, repair and operation area using a decision support system. The project execution will be the prominent part. Time allocation, strong management leadership focuses and funding for investment are needed so that the project runs smoothly and bring the desired output. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description The trend of oil and gas production is currently declining. This condition is <br /> <br /> <br /> exacerbated with the increasing trend of production cost. Thus, operation production efficiency is going to be the tag line to be solved now and in future decades. One of the messes came from the Industry supply chain condition, especially inventory condition. A very large amount of stockpile, dead stock, low turnover ratio and slow moving inventory material has been valid evidence in VICO Indonesia especially in terms of Maintenance, Repair and Operation (MRO). The worst thing happened when the stocked material is insufficient to cover the operation needs or the stocked material is not exactly the materials needed. The above condition leads many operations into halt. Thesewere common things likewise other PSC’s in Indonesia and oil and Gas Company all over the world. Based on the business problems occurred, inefficient and ineffective company's MRO inventory management condition will bring disaster for the company’s goal in future production efficiency. This final project is focused on how to optimize VICO Indonesia inventory management especially in maintenance, repair and operation area using a decision support system. The project execution will be the prominent part. Time allocation, strong management leadership focuses and funding for investment are needed so that the project runs smoothly and bring the desired output.
format Theses
author NUGRAHA (NIM : 29110109); Dosen Pembimbing : Yos Sunitiyoso, ST., M.Eng, PhD, ADITYA
spellingShingle NUGRAHA (NIM : 29110109); Dosen Pembimbing : Yos Sunitiyoso, ST., M.Eng, PhD, ADITYA
OPTIMIZING VICO INDONESIA INVENTORY SERVICE LEVEL IN MAINTENANCE, REPAIR AND OPERATION (MRO) ACTIVITIES USING DECISION SUPPORT SYSTEM
author_facet NUGRAHA (NIM : 29110109); Dosen Pembimbing : Yos Sunitiyoso, ST., M.Eng, PhD, ADITYA
author_sort NUGRAHA (NIM : 29110109); Dosen Pembimbing : Yos Sunitiyoso, ST., M.Eng, PhD, ADITYA
title OPTIMIZING VICO INDONESIA INVENTORY SERVICE LEVEL IN MAINTENANCE, REPAIR AND OPERATION (MRO) ACTIVITIES USING DECISION SUPPORT SYSTEM
title_short OPTIMIZING VICO INDONESIA INVENTORY SERVICE LEVEL IN MAINTENANCE, REPAIR AND OPERATION (MRO) ACTIVITIES USING DECISION SUPPORT SYSTEM
title_full OPTIMIZING VICO INDONESIA INVENTORY SERVICE LEVEL IN MAINTENANCE, REPAIR AND OPERATION (MRO) ACTIVITIES USING DECISION SUPPORT SYSTEM
title_fullStr OPTIMIZING VICO INDONESIA INVENTORY SERVICE LEVEL IN MAINTENANCE, REPAIR AND OPERATION (MRO) ACTIVITIES USING DECISION SUPPORT SYSTEM
title_full_unstemmed OPTIMIZING VICO INDONESIA INVENTORY SERVICE LEVEL IN MAINTENANCE, REPAIR AND OPERATION (MRO) ACTIVITIES USING DECISION SUPPORT SYSTEM
title_sort optimizing vico indonesia inventory service level in maintenance, repair and operation (mro) activities using decision support system
url https://digilib.itb.ac.id/gdl/view/17790
_version_ 1820745689544523776