PROJECT PROPOSAL TO IMPROVE POWER SYSTEM RELIABILITY AT DURI HOOU CRITICAL FACILITIES PT. CHEVRON PACIFIC INDONESIA

Power system reliability and availability are very important for critical facilities in Heavy Oil Operating Unit, Duri field, PT. Chevron Pacific Indonesia. Critical facilities in Heavy Oil Operating Unit is involving Central Gathering Stations (CGS), those are facilities to collect fluid production...

Full description

Saved in:
Bibliographic Details
Main Author: AMBAR BAWONO WISNUBROTO (NIM: 29106369), ADRIANUS
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/17806
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia