FINANCIAL FEASIBILITY ANALYSIS OF CABLE CAR CONSTRUCTION IN LEMBANG ̉̉ BANDUNG
Bandung City is one of the cities in Indonesia is growing. The rate of growth of Bandung is so fast that increasing economic activities so that the current <br /> <br /> <br /> movement of people continues to increase. Bandung is a city that was originally a city of education tur...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/17835 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
id |
id-itb.:17835 |
---|---|
spelling |
id-itb.:178352017-09-27T10:25:48ZFINANCIAL FEASIBILITY ANALYSIS OF CABLE CAR CONSTRUCTION IN LEMBANG ̉̉ BANDUNG QURBANI (NIM : 15005103); Pembimbing : Ir. Harun Al Rasyid Lubis, M.Sc., Ph.D, AGUS Indonesia Final Project INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/17835 Bandung City is one of the cities in Indonesia is growing. The rate of growth of Bandung is so fast that increasing economic activities so that the current <br /> <br /> <br /> movement of people continues to increase. Bandung is a city that was originally a city of education turned into a city of tourism is increasingly attracting the interest of newcomers to the city of Bandung. Areas that are frequently visited tourist destination is north Bandung to Lembang area so that the path in this <br /> <br /> <br /> corridor to be solid with the vehicle and not infrequently lead to congestion. That requires a new mode that has its own path so as not to interfere with the bottleneck that occurs, then the selected mode is cable car. The purpose of this study is to analyze the financial feasibility for the construction of this cable car transportation system. Scenarios conducted in this study is to offer three different types of cheap rate tariff by 5 thousand Rupiah, middle rate tarrif was 8 thousand rupiah, and the expensive tariffs of 10 thousand Rupiah. Of the three scenarios are calculated the cost of tariffs (cost) and benefit / income (benefit / revenue). From the analysis of the three scenarios FIRR rates obtained value is more than the MARR of 6.75% that which cheap rate tarrif 6,83%, middle rate tarrif 13,46%, expensive tarrif 17,04%. This concludes the cable car is financially feasible to be built by relying solely on capital from investors. text |
institution |
Institut Teknologi Bandung |
building |
Institut Teknologi Bandung Library |
continent |
Asia |
country |
Indonesia Indonesia |
content_provider |
Institut Teknologi Bandung |
collection |
Digital ITB |
language |
Indonesia |
description |
Bandung City is one of the cities in Indonesia is growing. The rate of growth of Bandung is so fast that increasing economic activities so that the current <br />
<br />
<br />
movement of people continues to increase. Bandung is a city that was originally a city of education turned into a city of tourism is increasingly attracting the interest of newcomers to the city of Bandung. Areas that are frequently visited tourist destination is north Bandung to Lembang area so that the path in this <br />
<br />
<br />
corridor to be solid with the vehicle and not infrequently lead to congestion. That requires a new mode that has its own path so as not to interfere with the bottleneck that occurs, then the selected mode is cable car. The purpose of this study is to analyze the financial feasibility for the construction of this cable car transportation system. Scenarios conducted in this study is to offer three different types of cheap rate tariff by 5 thousand Rupiah, middle rate tarrif was 8 thousand rupiah, and the expensive tariffs of 10 thousand Rupiah. Of the three scenarios are calculated the cost of tariffs (cost) and benefit / income (benefit / revenue). From the analysis of the three scenarios FIRR rates obtained value is more than the MARR of 6.75% that which cheap rate tarrif 6,83%, middle rate tarrif 13,46%, expensive tarrif 17,04%. This concludes the cable car is financially feasible to be built by relying solely on capital from investors. |
format |
Final Project |
author |
QURBANI (NIM : 15005103); Pembimbing : Ir. Harun Al Rasyid Lubis, M.Sc., Ph.D, AGUS |
spellingShingle |
QURBANI (NIM : 15005103); Pembimbing : Ir. Harun Al Rasyid Lubis, M.Sc., Ph.D, AGUS FINANCIAL FEASIBILITY ANALYSIS OF CABLE CAR CONSTRUCTION IN LEMBANG ̉̉ BANDUNG |
author_facet |
QURBANI (NIM : 15005103); Pembimbing : Ir. Harun Al Rasyid Lubis, M.Sc., Ph.D, AGUS |
author_sort |
QURBANI (NIM : 15005103); Pembimbing : Ir. Harun Al Rasyid Lubis, M.Sc., Ph.D, AGUS |
title |
FINANCIAL FEASIBILITY ANALYSIS OF CABLE CAR CONSTRUCTION IN LEMBANG ̉̉ BANDUNG |
title_short |
FINANCIAL FEASIBILITY ANALYSIS OF CABLE CAR CONSTRUCTION IN LEMBANG ̉̉ BANDUNG |
title_full |
FINANCIAL FEASIBILITY ANALYSIS OF CABLE CAR CONSTRUCTION IN LEMBANG ̉̉ BANDUNG |
title_fullStr |
FINANCIAL FEASIBILITY ANALYSIS OF CABLE CAR CONSTRUCTION IN LEMBANG ̉̉ BANDUNG |
title_full_unstemmed |
FINANCIAL FEASIBILITY ANALYSIS OF CABLE CAR CONSTRUCTION IN LEMBANG ̉̉ BANDUNG |
title_sort |
financial feasibility analysis of cable car construction in lembang ãâãâ bandung |
url |
https://digilib.itb.ac.id/gdl/view/17835 |
_version_ |
1820745704145944576 |