EVALUATION ON PLANNING AND CONTROLLING PINANG – PAGER GAS TRANSMISSION LINE REPLACEMENT PROJECT IN PT. CHEVRON PACIFIC INDONESIA

The 8 inches Pinang – Pager gas transmission line replacement, in the segment between Kerang and Ubi field for about 4.8 kilometers length, is one of 2006‐2007 Business Plans of Sumatera Light‐oil North (SLN), PT Chevron Pacific Indonesia (CPI). It is defined as a project sinc...

Full description

Saved in:
Bibliographic Details
Main Author: ZAINUDDIN (NIM : 29106380), AHMAD
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/17852
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
Be the first to leave a comment!
You must be logged in first