EVALUATION ON PLANNING AND CONTROLLING PINANG ̉̉ PAGER GAS TRANSMISSION LINE REPLACEMENT PROJECT IN PT. CHEVRON PACIFIC INDONESIA
The 8 inches Pinang – Pager gas transmission line replacement, in the segment between Kerang and Ubi field for about 4.8 kilometers length, is one of 2006‐2007 Business Plans of Sumatera Light‐oil North (SLN), PT Chevron Pacific Indonesia (CPI). It is defined as a project sinc...
Saved in:
Main Author: | ZAINUDDIN (NIM : 29106380), AHMAD |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/17852 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
EVALUATION ON PLANNING AND CONTROLLING PINANG ̉̉ PAGER GAS TRANSMISSION LINE REPLACEMENT PROJECT IN PT. CHEVRON PACIFIC INDONESIA
by: ZAINUDDIN (NIM : 29106380); Pembimbing: Ir. Rudy Bekti, MM , AHMAD -
Simulation of a pager assembly line
by: Chu, Pao Liang.
Published: (2010) -
Engineering faculty pager system
by: Corpus, Michael Vincent M., et al.
Published: (1996) -
AN EVALUATION OF THE PROJECT PERFORMANCE OF CRUDE OIL TEST STATION DEVELOPMENT OF PT. CHEVRON PACIFIC INDONESIA'S AT KULIN AREA ̉̉ RIAU
by: BASUKI (NIM : 29106374); Pembimbing : Ir. Rudy Bekti, MM, WASONO -
DROP IMPACT RESPONSE OF ELECTRONIC PAGERS
by: TEO YEP MIN
Published: (2019)