SILL PILLAR STABILITY ANALYSIS BASED ON JOINT MEASURING IN SOUTH CIURUG UNDERGROUND MINE, PT ANEKA TAMBANG Tbk. UBPE PONGKOR
Gold Mining Business Unit (UBPE) Pongkor is one of the mining unit PT. Aneka Tambang, Tbk. which is engaged in exploitation of gold and silver metal. Based on exploration data and research, pongkor gold ore deposit is a type epithermal deposits (vein). Mining system is underground mining Cut and Fil...
Saved in:
Main Author: | OKTA TRIANSYAH (NIM : 12105018); Pembimbing : Dr. Ir. Budi Sulistianto, MT., ALHADI |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/17891 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
Stability evaluation of Ciurug mine tunnel based on geomechanical classification in cut and fill Pongkor gold underground mine PT. Antam., TBK West Java Indonesia
by: , PHONEKEO, Vithaya, et al.
Published: (2009) -
OPTIMATION STUDY OF BLASTING PATTERN TO INCREASE THE ADVANCE OF BLASTING AT RAMP DOWN CENTRAL, CIURUG LEVEL 500, PT ANTAM UBPE PONGKOR
by: ISMI (NIM : 12105003); Pembimbing : Dr. Ir. Suseno Kramadibrata, M.Sc; Dr. Ganda Marihot Siman, FARIZ -
VENTILATION SYSTEM ANALYSIS With COEFFICIENT DIFFUSION CALCULATING of TRACER GAS METHOD in UBPE PONGKOR
by: EKA PUTRA (NIM 12101011), YULHANDRA -
ANALISIS PERGESERAN TITIK-TITIK PANTAU TAILING DAM UTAMA
(Studi Kasus PT. Aneka Tambang(Persero) Tbk. Unit Bisnis Pertambangan Emas, Pongkor)
by: , SANG PUTU INDRA GUNAWAN, et al.
Published: (2014) -
ANALISIS ESTIMASI CADANGAN EPITERMAL AU-AG BERDASARKAN LEBAR INTERVAL KOMPOSIT CONTO DENGAN METODE PENAKSIRAN IDS, NNP, DAN KRIGING STUDI KASUS: URAT CIURUG BLOK SELATAN 3, UBPE PONGKOR, LEVEL 500 DAN LEVEL600
by: PRASETYO ZEN , ERIK