ANALISIS VARIABEL KETIDAKPASTIAN PADA ESTIMASI HARGA SATUAN PEKERJAAN PROYEK KONSTRUKSI

In order to get the reliable price, contractor needs to identify and <br /> analyze the unpredictable or unforeseeable event which both being <br /> categorized as uncertainty. Cost to anticipate the uncertainty is allocated <br /> as contingency cost. Trough the understandin...

Full description

Saved in:
Bibliographic Details
Main Author: Partawijaya, Yan
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/1792
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia