ANALISIS VARIABEL KETIDAKPASTIAN PADA ESTIMASI HARGA SATUAN PEKERJAAN PROYEK KONSTRUKSI
In order to get the reliable price, contractor needs to identify and <br /> analyze the unpredictable or unforeseeable event which both being <br /> categorized as uncertainty. Cost to anticipate the uncertainty is allocated <br /> as contingency cost. Trough the understandin...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/1792 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
id |
id-itb.:1792 |
---|---|
spelling |
id-itb.:17922004-04-15T09:21:15ZANALISIS VARIABEL KETIDAKPASTIAN PADA ESTIMASI HARGA SATUAN PEKERJAAN PROYEK KONSTRUKSI Partawijaya, Yan Indonesia Theses INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/1792 In order to get the reliable price, contractor needs to identify and <br /> analyze the unpredictable or unforeseeable event which both being <br /> categorized as uncertainty. Cost to anticipate the uncertainty is allocated <br /> as contingency cost. Trough the understanding and analysis on this <br /> uncertainty, contractor expectedly could bid with the most responsible <br /> price and also for the lower risk. <br /> The objective of this research is to do some identification and <br /> analysis on the uncertainty variables, so the most influenced variable of <br /> unit price estimation can be found and to get a relation between variable <br /> and unit price component as well. <br /> The benefits of this research are helping contractor to optimize the <br /> allocation of the contingency cost and determining more realistic owner <br /> estimation. text |
institution |
Institut Teknologi Bandung |
building |
Institut Teknologi Bandung Library |
continent |
Asia |
country |
Indonesia Indonesia |
content_provider |
Institut Teknologi Bandung |
collection |
Digital ITB |
language |
Indonesia |
description |
In order to get the reliable price, contractor needs to identify and <br />
analyze the unpredictable or unforeseeable event which both being <br />
categorized as uncertainty. Cost to anticipate the uncertainty is allocated <br />
as contingency cost. Trough the understanding and analysis on this <br />
uncertainty, contractor expectedly could bid with the most responsible <br />
price and also for the lower risk. <br />
The objective of this research is to do some identification and <br />
analysis on the uncertainty variables, so the most influenced variable of <br />
unit price estimation can be found and to get a relation between variable <br />
and unit price component as well. <br />
The benefits of this research are helping contractor to optimize the <br />
allocation of the contingency cost and determining more realistic owner <br />
estimation. |
format |
Theses |
author |
Partawijaya, Yan |
spellingShingle |
Partawijaya, Yan ANALISIS VARIABEL KETIDAKPASTIAN PADA ESTIMASI HARGA SATUAN PEKERJAAN PROYEK KONSTRUKSI |
author_facet |
Partawijaya, Yan |
author_sort |
Partawijaya, Yan |
title |
ANALISIS VARIABEL KETIDAKPASTIAN PADA ESTIMASI HARGA SATUAN PEKERJAAN PROYEK KONSTRUKSI |
title_short |
ANALISIS VARIABEL KETIDAKPASTIAN PADA ESTIMASI HARGA SATUAN PEKERJAAN PROYEK KONSTRUKSI |
title_full |
ANALISIS VARIABEL KETIDAKPASTIAN PADA ESTIMASI HARGA SATUAN PEKERJAAN PROYEK KONSTRUKSI |
title_fullStr |
ANALISIS VARIABEL KETIDAKPASTIAN PADA ESTIMASI HARGA SATUAN PEKERJAAN PROYEK KONSTRUKSI |
title_full_unstemmed |
ANALISIS VARIABEL KETIDAKPASTIAN PADA ESTIMASI HARGA SATUAN PEKERJAAN PROYEK KONSTRUKSI |
title_sort |
analisis variabel ketidakpastian pada estimasi harga satuan pekerjaan proyek konstruksi |
url |
https://digilib.itb.ac.id/gdl/view/1792 |
_version_ |
1820663062685810688 |