ANALISIS WIND GUST UNTUK PROJECT PLANNING OFFSHORE RIG MOVE PT. TOTAL E&P INDONESIE (STUDI KASUS : BLOK MAHAKAM, KALIMANTAN TIMUR)
In case if the drilling operation will be held in offshore field, rig will be pulled by some ships, into drilling location which called offshore rig move. Offshore rig move in Blok Mahakam can be obstructed because of meteorology phenomenon, which is drastically increasement of the surface wind velo...
Saved in:
Main Author: | BERNARDUS ARVIN RINALDI (NIM : 12809023) |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/18158 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
Gust.
by: Poh, Zi Qun.
Published: (2013) -
AUTOMATIC SUBASSEMBLY SEQUENCING FOR OFFSHORE RIGS
by: ABBOTT ERNEST LESLIE SIDNEY
Published: (2015) -
Study on airfoil performance in gusts
by: Chan, Samuel Ka Seng.
Published: (2013) -
Strategi pengelolaan kualitas air sungai Mahakam Kalimantan Timur
by: , ADI, Pamungkas Waluyo, et al.
Published: (2001) -
INTERACTION BETWEEN JACK-UP RIG FOUNDATIONS AND OFFSHORE PLATFORM PILES.
by: Chow, Y.K.
Published: (2014)