PRODUCTIVITY MEASUREMENT PROBLEMS AT FORMWORK JOB AND COLUMN REINFORCING AT THE EDGE SUPER BLOCK PROJECT

Productivity determines the successful of construction project's schedule. Most of resources in construction are dominated by human. Reinforcing and column formwork in multistory building construction's project is ones of activity that can't be separated from a series of construction...

Full description

Saved in:
Bibliographic Details
Main Author: FANDIM M (NIM: 15005043); Pembimbing: Dr.Ir.Puti Farida Marzuki, CHIVALRIST
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/18211
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
Be the first to leave a comment!
You must be logged in first