Plant equipment maintenance forms a certain means to maintain plant operations reliability, so that the commitment made by management in the objective to meet product shipping commitment to the customers can be achieved, with such customers as a user of the product will be satisfied. Maintenance man...

Full description

Saved in:
Bibliographic Details
Main Author: Supriadi, Deddy
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/1822
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:1822
spelling id-itb.:18222004-12-07T13:04:47ZANALYSIS PENGGUNAAN WAKTU KERJA OLEH PEKERJA KONTRAK UNIT PRICE PEMELIHARAAN KILANG DI PT BADAK NGL, BONTANG Supriadi, Deddy Indonesia Theses INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/1822 Plant equipment maintenance forms a certain means to maintain plant operations reliability, so that the commitment made by management in the objective to meet product shipping commitment to the customers can be achieved, with such customers as a user of the product will be satisfied. Maintenance management in seeking equipment reliability of course should utilize certain maintenance programs, one such maintenance program in PT Badak NGL is to perform maintenance work as \"outsourcing\", that is to have maintenance work handled by a third party which is able to maintain equipment with appropriate skill. One of the types of implementing outsourcing which has been done is to contract work based on a unit price for each type of work, where the contractor will be paid as per the agreed unit price once the work is completed. Therefore, contractor must be able to control workers, so that they are able to complete the jobs as much as possible with safety, good quality and within schedule as per PT Badak requirements. In order to know the productivity level of the workers, we need to measure the current productivity. Based on the result of this measurement we can establish improvement strategies and finally analyze the effectiveness of the implemented improvement strategy. Relating to this matter, the writer has made measurement of productivity level of the unit rate contractor worker for mechanical jobs in the PT Badak NGL Maintenance Department by using the Work Sampling method. That work sampling method is used as a tool to identify the real problems that happen in the field, so the analysis result from observation will provide a definitive indication for follow-up action. Consequently the work sampling method is not a problem solver. In order to simplify the productivity survey, the maintenance plant workers are divided into two categories, such as \"Productive Activities\" and \"Non-productive Activities (delay)\". The productivity activities are also divided into two parts, that is the \"direct activities\" and the \"support activities\". text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description Plant equipment maintenance forms a certain means to maintain plant operations reliability, so that the commitment made by management in the objective to meet product shipping commitment to the customers can be achieved, with such customers as a user of the product will be satisfied. Maintenance management in seeking equipment reliability of course should utilize certain maintenance programs, one such maintenance program in PT Badak NGL is to perform maintenance work as \"outsourcing\", that is to have maintenance work handled by a third party which is able to maintain equipment with appropriate skill. One of the types of implementing outsourcing which has been done is to contract work based on a unit price for each type of work, where the contractor will be paid as per the agreed unit price once the work is completed. Therefore, contractor must be able to control workers, so that they are able to complete the jobs as much as possible with safety, good quality and within schedule as per PT Badak requirements. In order to know the productivity level of the workers, we need to measure the current productivity. Based on the result of this measurement we can establish improvement strategies and finally analyze the effectiveness of the implemented improvement strategy. Relating to this matter, the writer has made measurement of productivity level of the unit rate contractor worker for mechanical jobs in the PT Badak NGL Maintenance Department by using the Work Sampling method. That work sampling method is used as a tool to identify the real problems that happen in the field, so the analysis result from observation will provide a definitive indication for follow-up action. Consequently the work sampling method is not a problem solver. In order to simplify the productivity survey, the maintenance plant workers are divided into two categories, such as \"Productive Activities\" and \"Non-productive Activities (delay)\". The productivity activities are also divided into two parts, that is the \"direct activities\" and the \"support activities\".
format Theses
author Supriadi, Deddy
spellingShingle Supriadi, Deddy
ANALYSIS PENGGUNAAN WAKTU KERJA OLEH PEKERJA KONTRAK UNIT PRICE PEMELIHARAAN KILANG DI PT BADAK NGL, BONTANG
author_facet Supriadi, Deddy
author_sort Supriadi, Deddy
title ANALYSIS PENGGUNAAN WAKTU KERJA OLEH PEKERJA KONTRAK UNIT PRICE PEMELIHARAAN KILANG DI PT BADAK NGL, BONTANG
title_short ANALYSIS PENGGUNAAN WAKTU KERJA OLEH PEKERJA KONTRAK UNIT PRICE PEMELIHARAAN KILANG DI PT BADAK NGL, BONTANG
title_full ANALYSIS PENGGUNAAN WAKTU KERJA OLEH PEKERJA KONTRAK UNIT PRICE PEMELIHARAAN KILANG DI PT BADAK NGL, BONTANG
title_fullStr ANALYSIS PENGGUNAAN WAKTU KERJA OLEH PEKERJA KONTRAK UNIT PRICE PEMELIHARAAN KILANG DI PT BADAK NGL, BONTANG
title_full_unstemmed ANALYSIS PENGGUNAAN WAKTU KERJA OLEH PEKERJA KONTRAK UNIT PRICE PEMELIHARAAN KILANG DI PT BADAK NGL, BONTANG
title_sort analysis penggunaan waktu kerja oleh pekerja kontrak unit price pemeliharaan kilang di pt badak ngl, bontang
url https://digilib.itb.ac.id/gdl/view/1822
_version_ 1820663072733265920