PENINGKATAN PERBAIKAN DAN PEMELIHARAAN LOADING POINT DI TAMBANG BAWAH TANAH DEEP ORE ZONE PT FREEPORT INDONESIA
Draw point availability on Deep Ore Zone Underground Mine is consistently trending down <br /> <br /> <br /> <br /> <br /> during 2010. In sustaining 80K production rate, UG DOZ Production realized that increasing <br /> <br /...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/18403 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Summary: | Draw point availability on Deep Ore Zone Underground Mine is consistently trending down <br />
<br />
<br />
<br />
<br />
during 2010. In sustaining 80K production rate, UG DOZ Production realized that increasing <br />
<br />
<br />
<br />
<br />
draw point availability is urgently very important to do in order to mitigate the obstacles in <br />
<br />
<br />
<br />
<br />
achieving good draw control. <br />
<br />
<br />
<br />
<br />
Using conceptual framework trough Reliability Centered Maintenance (RCM), Failure Mode and <br />
<br />
<br />
<br />
<br />
Effect Analysis (FMEA) that is showing that root cause of high recorded LP repair and <br />
<br />
<br />
<br />
<br />
maintenance activities is empty chute as safety bumper of LP, inappropriate and poor integration <br />
<br />
<br />
<br />
<br />
of repair & maintenance process between several sections that involved. <br />
<br />
<br />
<br />
<br />
Thus, this project will be focused on reducing draw point closed temporary through on effort to <br />
<br />
<br />
<br />
<br />
how to reducing draw point closed temporary through mindset and behavior change to <br />
<br />
<br />
<br />
<br />
maintenance process of Loading Point. UG DOZ Production, UG Cave Management, UG <br />
<br />
<br />
<br />
<br />
Construction, UG Mechanic, UG Electrical, and other parties will be required in collaboration on <br />