PENINGKATAN PERBAIKAN DAN PEMELIHARAAN LOADING POINT DI TAMBANG BAWAH TANAH DEEP ORE ZONE PT FREEPORT INDONESIA
Draw point availability on Deep Ore Zone Underground Mine is consistently trending down <br /> <br /> <br /> <br /> <br /> during 2010. In sustaining 80K production rate, UG DOZ Production realized that increasing <br /> <br /...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/18403 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
id |
id-itb.:18403 |
---|---|
spelling |
id-itb.:184032017-09-27T15:30:58ZPENINGKATAN PERBAIKAN DAN PEMELIHARAAN LOADING POINT DI TAMBANG BAWAH TANAH DEEP ORE ZONE PT FREEPORT INDONESIA ENOCH (NIM: 29109412), ENGEL Indonesia Theses INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/18403 Draw point availability on Deep Ore Zone Underground Mine is consistently trending down <br /> <br /> <br /> <br /> <br /> during 2010. In sustaining 80K production rate, UG DOZ Production realized that increasing <br /> <br /> <br /> <br /> <br /> draw point availability is urgently very important to do in order to mitigate the obstacles in <br /> <br /> <br /> <br /> <br /> achieving good draw control. <br /> <br /> <br /> <br /> <br /> Using conceptual framework trough Reliability Centered Maintenance (RCM), Failure Mode and <br /> <br /> <br /> <br /> <br /> Effect Analysis (FMEA) that is showing that root cause of high recorded LP repair and <br /> <br /> <br /> <br /> <br /> maintenance activities is empty chute as safety bumper of LP, inappropriate and poor integration <br /> <br /> <br /> <br /> <br /> of repair & maintenance process between several sections that involved. <br /> <br /> <br /> <br /> <br /> Thus, this project will be focused on reducing draw point closed temporary through on effort to <br /> <br /> <br /> <br /> <br /> how to reducing draw point closed temporary through mindset and behavior change to <br /> <br /> <br /> <br /> <br /> maintenance process of Loading Point. UG DOZ Production, UG Cave Management, UG <br /> <br /> <br /> <br /> <br /> Construction, UG Mechanic, UG Electrical, and other parties will be required in collaboration on <br /> <br /> <br /> <br /> <br /> improvements of People, Process, and Technology. text |
institution |
Institut Teknologi Bandung |
building |
Institut Teknologi Bandung Library |
continent |
Asia |
country |
Indonesia Indonesia |
content_provider |
Institut Teknologi Bandung |
collection |
Digital ITB |
language |
Indonesia |
description |
Draw point availability on Deep Ore Zone Underground Mine is consistently trending down <br />
<br />
<br />
<br />
<br />
during 2010. In sustaining 80K production rate, UG DOZ Production realized that increasing <br />
<br />
<br />
<br />
<br />
draw point availability is urgently very important to do in order to mitigate the obstacles in <br />
<br />
<br />
<br />
<br />
achieving good draw control. <br />
<br />
<br />
<br />
<br />
Using conceptual framework trough Reliability Centered Maintenance (RCM), Failure Mode and <br />
<br />
<br />
<br />
<br />
Effect Analysis (FMEA) that is showing that root cause of high recorded LP repair and <br />
<br />
<br />
<br />
<br />
maintenance activities is empty chute as safety bumper of LP, inappropriate and poor integration <br />
<br />
<br />
<br />
<br />
of repair & maintenance process between several sections that involved. <br />
<br />
<br />
<br />
<br />
Thus, this project will be focused on reducing draw point closed temporary through on effort to <br />
<br />
<br />
<br />
<br />
how to reducing draw point closed temporary through mindset and behavior change to <br />
<br />
<br />
<br />
<br />
maintenance process of Loading Point. UG DOZ Production, UG Cave Management, UG <br />
<br />
<br />
<br />
<br />
Construction, UG Mechanic, UG Electrical, and other parties will be required in collaboration on <br />
<br />
<br />
<br />
<br />
improvements of People, Process, and Technology. |
format |
Theses |
author |
ENOCH (NIM: 29109412), ENGEL |
spellingShingle |
ENOCH (NIM: 29109412), ENGEL PENINGKATAN PERBAIKAN DAN PEMELIHARAAN LOADING POINT DI TAMBANG BAWAH TANAH DEEP ORE ZONE PT FREEPORT INDONESIA |
author_facet |
ENOCH (NIM: 29109412), ENGEL |
author_sort |
ENOCH (NIM: 29109412), ENGEL |
title |
PENINGKATAN PERBAIKAN DAN PEMELIHARAAN LOADING POINT DI TAMBANG BAWAH TANAH DEEP ORE ZONE PT FREEPORT INDONESIA |
title_short |
PENINGKATAN PERBAIKAN DAN PEMELIHARAAN LOADING POINT DI TAMBANG BAWAH TANAH DEEP ORE ZONE PT FREEPORT INDONESIA |
title_full |
PENINGKATAN PERBAIKAN DAN PEMELIHARAAN LOADING POINT DI TAMBANG BAWAH TANAH DEEP ORE ZONE PT FREEPORT INDONESIA |
title_fullStr |
PENINGKATAN PERBAIKAN DAN PEMELIHARAAN LOADING POINT DI TAMBANG BAWAH TANAH DEEP ORE ZONE PT FREEPORT INDONESIA |
title_full_unstemmed |
PENINGKATAN PERBAIKAN DAN PEMELIHARAAN LOADING POINT DI TAMBANG BAWAH TANAH DEEP ORE ZONE PT FREEPORT INDONESIA |
title_sort |
peningkatan perbaikan dan pemeliharaan loading point di tambang bawah tanah deep ore zone pt freeport indonesia |
url |
https://digilib.itb.ac.id/gdl/view/18403 |
_version_ |
1820745872578707456 |