#TITLE_ALTERNATIVE#

The need for a quality construction industry’s product gives challenge for providers of construction services. On the other hand, the construction industry still faces the problem of inefficiency in the implementation of the construction process. Lean construction is a new approach in constructi...

Full description

Saved in:
Bibliographic Details
Main Author: SEPTIAN (NIM : 15007088) ; Pembimbing : IR. MUHAMAD ABDUH, MT., PH.D, FAJRI
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/18447
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
Description
Summary:The need for a quality construction industry’s product gives challenge for providers of construction services. On the other hand, the construction industry still faces the problem of inefficiency in the implementation of the construction process. Lean construction is a new approach in construction. Last Planner system on lean construction aims to reduce waste and maximize value by performing scheduling and controlling production units as well. This thesis aims to analyze the application of scheduling and controlling are performed on one EPC project and then compare it with the principles of last planner system. The method used uses descriptive analytical method.